Vibration Isolation Case Studies
DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.
Series
Equipment Type
Manufacturer
All Case Studies

GRGT Helios G5 CX DualBeam DVIA-M1000 (230818R1-1) Installation Report
DVIA-M1000 abbreviated worksheet (serial 230818R1-1). Setup dated 23.11.29 and reporting dated 23.12.06; measurement date 2023.11.29 (Wednesday) in Wuxi with operator Jongwon Park from DAEIL SYSTEMS. END USER GRGT; target equipment Helios G5 CX DualBeam and installation site Wuxi as in the form. The Overview block states the standard DVIA-M1000 sentence only. No vibration specification, equipment status, tuning request, measurement summary table, or Reference section appears in the source. The internal-program section title in the source reads “M1000 internal program performance measurement result”; published figures are three plots labeled Z axis, X axis, and Y axis. Decorative header graphics from the Word file are omitted from public copy.

Ohio State University Nanotech West Lab Raith EPBG 5150 DVIA-MB3000 VEC (221130R3) Installation Report — 2023.11.30
DVIA-MB3000 (serial 221130R3, platform DVIA-MB3000 - 1800 x 1300 mm) VEC installation worksheet at Ohio State University Nanotech West Lab with Raith EPBG 5150. Form tuning date 23.11.30; UI program transmissibility (Z/X/Y) and VEC plots including floor/active VC, floor/active vibration, high-frequency transmissibility, and repeat-axis transmissibility curves per the worksheet; Reference as a markdown Generic Vibration Criteria table (no separate criterion figure). Engineer Youngha Lee (DAEIL SYSTEMS); report written date on form 23.12.19.

RAITH EBPG5150 E-Beam Lithography System DVIA-MB3000 Installation Report
RAITH EBPG5150 E-Beam Lithography System DVIA-MB3000 Installation

Hitachi FE-SEM SU8600 DVIA-M1000 Internal Program Performance Report — Toyota, Shanghai (2023)
Commissioning-format memo (SN 221202R6): installation photograph under the M1000 setup heading and M1000 internal-program Z / X / Y axis measurement captures from the Signal program.

China University Of Geosciences (Wuhan) Apreo DVIA-M1000 (230224R2) Installation Report
DVIA-M1000 abbreviated worksheet (serial 230224R2). Setup and reporting dated 23.11.24; measurement date 2023.11.24 (Friday) in Wuhan with operator Jongwon Park from DAEIL SYSTEMS. END USER China University Of Geosciences, Wuhan; target equipment Apreo and installation site Wuhan as in the form. The Overview block states the standard DVIA-M1000 sentence only. No vibration specification, equipment status, tuning request, measurement summary table, or Reference section appears in the source. The internal-program section title in the source reads “M1000 internal program performance measurement result”; published figures are three plots labeled Z axis, X axis, and Y axis. Decorative header graphics from the Word file are omitted from public copy.

Beijing Academy of Quantum Information Sciences STM DVIA-M1000 (230905R3) Installation Report
DVIA-M1000 installation report (serial 230905R3) — STM at Beijing Academy of Quantum Information Sciences, BEIJING. Short handout: overview, measurement metadata, and M1000 internal program Z/X/Y performance measurement captures. Reference uses the standard Generic Vibration Criteria markdown table only.