Skip to main content

Vibration Isolation Case Studies

DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.

Series

Equipment Type

Manufacturer

All Case Studies

1264 case studies
Thermo Fisher Scientific Apreo 2S HiVac DVIA-M1000 Installation Report

GRGT / Shanghai — Apreo 2S HiVac on DVIA-M1000 (230905R2). M1000 internal program measurement (full view and Z/X/Y plots).

TUSUR, Tomsk Emcraft Veritas 3100 DVIA-MB1000 Installation Report — 2023.10.27

DVIA-MB1000 (SN 220825R6-3) under Emcraft Veritas 3100 for TUSUR, Tomsk, Russia — engineer itinerary, onsite tuning window, Z/X/Y transmissibility plots (no standalone equipment photograph in source).

Guangdong Jiashang Solaris GMH DVIA-M1000 (230809R2) Installation Report

DVIA-M1000 abbreviated worksheet (serial 230809R2). Setup dated 23.11.02 and reporting dated 23.11.03; measurement date 2023.11.02 (Thursday) in Dongguan with operator Jongwon Park from DAEIL SYSTEMS. END USER Guangdong Jiashang New Energy Tech Co., Ltd.; target equipment Solaris GMH and installation site Dongguan as in the form. The Overview block states the standard DVIA-M1000 sentence only. No vibration specification, equipment status, tuning request, measurement summary table, or Reference section appears in the source. The internal-program section title in the source reads “M1000 internal program performance measurement result”; published figures are three plots labeled Z axis, X axis, and Y axis. Decorative header graphics from the Word file are omitted from public copy.

Huawei Solaris GMH DVIA-M1000 Installation Report (230509R6-2)
Installation Report
DVIA-M Series
11-01-2023

Huawei Solaris GMH DVIA-M1000 Installation Report (230509R6-2)

Huawei-end Solaris GMH site (Shanghai): DVIA-M1000 serial 230509R6-2 setup — internal program performance screenshots for Z, X, and Y axes.

Sungkyunkwan University JEOL JBX-8100FX DVIA-P2200 (220509R3) Inspection Report

DVIA-P2200 (serial 220509R3) inspection at Sungkyunkwan University Research Building for JEOL JBX-8100FX electron beam lithography. Engineers Youngha Lee and Jongwon Park; tuning and report October 31, 2023. Feedback/feedforward re-tuning completed with good performance; Caution AIR LED from low regulator pressure (no performance impact). Summary VC grades (floor vs active) and Z/X/Y VC curves from the inspection handout.

Dow Chemical Sigma 300 DVIA-M1000 (230328R3) Installation Report

DVIA-M1000 abbreviated worksheet for serial 230328R3 (source filename M1000_230328R3_23.10.31.docx). Setup and reporting dated 23.10.31; measurement date 2023.10.31 (Tuesday) in Shanghai with operator Sangjae Lee (DAEIL SYSTEMS). END USER Dow Chemical; target equipment Sigma 300 and installation site Shanghai as in the form. The Overview block states the standard DVIA-M1000 sentence only. No vibration specification, equipment status, tuning request, measurement summary table, or Reference section appears in the source. The internal-program section title reads “M1000 internal program performance measurement result”; published figures are three plots labeled Z axis, X axis, and Y axis. The form header line shows (M1000_ 230328R3 Set up). Decorative header graphics from the Word file are omitted from public copy.