Vibration Isolation Case Studies
DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.
Series
Equipment Type
Manufacturer
All Case Studies

Youyan Yijin New Materials Thermo fisher Helios G5 FIB-SEM DVIA-M1000 (240205R5) Installation Report
DVIA-M1000 installation report — Thermo fisher FIB-SEM Helios G5 (serial 240205R5) for Youyan Yijin New Materials Co., Ltd. Overview states the platform is appropriately installed and functioning as intended. Tuning May 15, 2024; report written date on the form is 24.07.06. Location 德州. The published form has no End User row and no vibration specification section. Equipment condition The equipment is installed. Tuning Request N/A (no tuning-request figure in this handout). Published plots are vertical, left-to-right, and front-to-back transmissibility from the measurement UI program, plus an on-site equipment photo; Reference uses the standard VC criterion markdown table only.

Korea University R&D Center RAITH PIONEER Two DVIA-MB1000 Installation Report
Korea University R&D Center RAITH PIONEER Two DVIA-MB1000 Installation

FEI FE-SEM NOVA NANOSEM 450 DVIA-M1000 (160808R2-2) Installation Report — 2024-07-05
Compact DVIA-M1000 setup worksheet (serial 160808R2-2) for FEI FE-SEM NOVA NANOSEM 450: form table (END USER and installation site N/A in source), overview sentence, then M1000 internal-program performance plots labeled Vertical, Left to Right, and Front to Back. Reference uses the standard Generic Vibration Criteria markdown table.

Sun Yat-sen University JEOL EA1400 TEM DVIA-M-JT2 (220126R7-4) Internal Program Performance — 2024.07.05
DVIA-M-JT2 worksheet from DOCX M-JT2_220126R7-4_24.07.05: target equipment JEOL EA1400; END USER Sun Yat-sen University; installation place GUANGDONG; setup 24.04.11 and reporting 24.07.05; operator Chaewon Lee; overview block includes tuning focus on stability, measurement date 2024.04.11 (Thursday), operator Chaewon Lee from DAEIL SYSTEMS, place GUANGDONG, manufacturer JEOL, equipment TEM, model EA1400. Internal program section publishes Vertical, Left to Right, and Front to Back plots only; this document revision has no decorative header embeds in word/media before those plots.

ZEISS GeminiSEM 360 DVIA-M1000 Internal Performance Report (220603R4, 2024-07-05)
Abbreviated DVIA-M1000 worksheet (serial 220603R4) for ZEISS GeminiSEM 360. Setup 23.08.09, reporting 24.07.05; measurement 2023.08.09 with operator Chaewon Lee (DAEIL SYSTEMS). Place of installation, END USER, and place of measurement are blank in the source and are published as N/A. No vibration specification, measurement summary table, or Reference section appears in the source. Internal-program plots are labeled Vertical, Left to Right, and Front to Back.

DVIA-M1000 (230111R6) Set-up Report — ZEISS Sigma500
DVIA-M1000 set-up report (serial 230111R6) for ZEISS Sigma500 SEM. Internal program performance plots (vertical, left–right, front–back).