Skip to main content

Vibration Isolation Case Studies

DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.

Series

Equipment Type

Manufacturer

All Case Studies

1264 case studies
Hana Materials Cheonan MO3000 (P3) Vibration Environment Measurement — 28 Apr 2017

MO3000 (P3) vibration environment survey at Hana Materials, Cheonan on 28 April 2017: the vibration isolation platform top and the research-building floor were measured; results are summarized as VC classes with Z, X, and Y VC-CLASS graphs. Onboard equipment: KEYENCE VK-X200. Engineer Im Jong-wook (DAEIL SYSTEMS).

East China Normal University FEI Helios G4 UX DVIA-MB1000 (P36) China trip installation report — 2017.04.24

DVIA-MB1000 worksheet P36 from the 2017-04-24 Chinese trip report for FEI Helios G4 UX at EAST CHINA NORMAL UNIVERSITY (Shanghai, China). Trip date 17.04.18; trip personnel Lim, Jongwook. Installation result summary table and follow-up notes follow the form verbatim; MB1000 internal program and vibration-environment UI captures are published under Z, X, and Y with §2a embed mapping (image3–8). Decorative image1 and the large title-block raster following the centred report heading (image2) are omitted from the public page.

Xiamen Changelight TESCAN LYRA3 DVIA-MB1000 (P42) China trip installation report — 2017.04.24

DVIA-MB1000 worksheet P42 from the 2017-04-24 Chinese trip report for TESCAN LYRA3 at XIAMEN CHANGELIGHT COMPANY (Xiamen, China). Trip date 17.04.20; trip personnel Lim, Jongwook. Installation result summary table and follow-up notes follow the form verbatim; MB1000 internal program and vibration-environment UI captures are published under Z, X, and Y with §2a embed mapping (image3–8). Decorative image1 and the large title-block raster under the centred report title (image2) are omitted from the public page.

KPSNC Shanghai ZEISS EVO18 DVIA-MB1000 (MB1000 P22) China business trip worksheet — 2017.03.20

Korean-format China business-trip worksheet MB1000 P22 for DVIA-MB1000 with target equipment ZEISS EVO18 in Shanghai at a corporate R&D lab on the 1st floor. End user Kolbenschmidt Pierburg Shanghai Nonferrous Compenents co.,ltd (KPSNC). Trip 17.03.17, engineer Jong-wook Lim (임종욱), report dated 17.03.20. The public page includes the workshop photograph embedded after the title block (DOCX §2a, Word image2), MB1000 internal-program captures for Z/X/Y axes (image3–5), and vibration-environment graphs for Z/X/Y (image6–8). The decorative title-strip banner (Word image1, no preceding paragraph head) is not published.

Beijing FEI SCIOS DVIA-MB1000 (P41) China business-trip setup — National Information Security Center — 2017.03.20

MB1000 program line P41 trip worksheet for FEI SCIOS in Beijing, China, for end user National Information Security Center. Strict site security prevented vibration measurement; the engineer verified setup and MB1000 internal-program performance only. The public gallery includes the on-site photograph placed after the report title and the Z-, X-, and Y-axis internal-program performance screens; the centered graphic above the title is omitted as non-technical decoration.

KPSNC DVIA-M type (MB1000) installation test data — 2017.03.17

2017 worksheet for DVIA-M type (MB1000) installation test data with user tag KPSNC: installation & measurement 2017.03.17, reporting 2017.03.20, operator LIM JONG UK (DAEIL SYSTEMS). The public page includes transmissibility-with-coherence plots (Z, X, Y) and octave-band plots (Z, X, Y). Page 1 is text only; none of the title-block spacer paragraphs include publishable diagrams.