Skip to main content

Vibration Isolation Case Studies

DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.

Series

Equipment Type

Manufacturer

All Case Studies

1264 case studies
Shanghai Institute of Materials Research ZEISS Gemini 500 DVIA-MB1000 (P64) Installation Worksheet — 2017.07.02

MB1000 P64 worksheet for a ZEISS Gemini 500 site in Shanghai: trip 2017-06-29, report dated 2017-07-02, field engineer Choi, Sungwon (DAEIL SYSTEMS). Published VC-class summary (Base / Top / ACTIVE), narrative bullets from the handout, MB1000 internal-program Z/X/Y plots, and vibration-environment Z/X/Y plots. The centred title-line banner raster (408×83) is not republished.

China business trip report — MB1000 P43 setup and T56 NMR test (June 2017)

Worksheet dated 17.06.26 by Deputy Lim Jong-wook covering 17.06.20–17.06.23: NEMO office work including T56 sensor service, MB1000_P22 inspection at China Normal University, T56 NMR validation at Hudan University with SUS304 shielding notes, and MB1000_P43 setup with vibration-environment measurement in Wuxi for a ZEISS SIGMA HD with end user Qualcomm.

Tier-1 Semiconductor Cheonan Engineer Room DVIA-MB3000 (P4) Vibration Measurement — 16 Jun 2017

On-site DVIA-MB3000 (designator P4) vibration survey at Tier-1 Semiconductor’s Cheonan engineer room on 16 June 2017. Floor and MB3000 platform top were measured in STANDBY-mounted-equipment condition; results are summarized in VC classes and plotted for vertical (Z) and horizontal (X, Y) axes. Engineer Choi Seong-won (DAEIL SYSTEMS).

South China University of Technology ZEISS SIGMA 300 VP DVIA-MB1000 (P19) Guangzhou trip report — 2017.06.05

Korean-format China business-trip worksheet for DVIA-MB1000 program line MB1000 P19 with target equipment ZEISS SIGMA 300 VP for end user South China University of Technology (Guangzhou, university research building 1F cleanroom). Business trip 2017-06-01–2017-06-03; report dated 2017-06-05; operator line in the source names Deputy Manager Lim Jong-wook. The public page publishes the installation photograph after the title block (DOCX image2, §2a), MB1000 internal-program screenshots for Z, X, and Y (image3–5), and vibration-environment plots for Z, X, and Y (image6–8). The centred decorative title-line bitmap (image1) is omitted.

ZEISS Gemini FE-SEM DVIA-MB1000 Installation Report
Installation Report
DVIA-M Series
06-02-2017

ZEISS Gemini FE-SEM DVIA-MB1000 Installation Report

ZEISS Gemini FE-SEM DVIA-MB1000 Installation

Hana Materials (Cheonan) KEYENCE VK-X200 DVIA-MO3000 (MO3000_P3) vibration measurement report

MO3000_P3 vibration environment worksheet dated 2017-04-28 at Hana Materials, Cheonan: KEYENCE VK-X200 target tool; floor vs isolator top-plate VC-Class summary (building floor B/C/C, isolator top F/F/G); VC-CLASS graphs and internal-program transmissibility plots for Z, X, and Y. Field engineer Im Jong-wook (DAEIL SYSTEMS). Decorative title-band bitmap from the Word header block was not published.