Skip to main content

Vibration Isolation Case Studies

DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.

Series

Equipment Type

Manufacturer

All Case Studies

1264 case studies
ZEISS Crossbeam 550 DVIA-MB1000 (P204 / 201013R2) Internal program performance — 2021.01.19

DVIA-MB1000 worksheet P204 (serial 201013R2) for ZEISS Crossbeam 550 with (measurement 2021.01.18, report 2021.01.19; operator Choi, HyoungMun, Daeil System). Summary transmissibility table and overview text match the DOCX; MB1000 internal-program screenshots follow Z, X, and Y axis headings per §2a embed mapping (rId9→image2 … rId11→image4). The decorative raster under the centred MB1000 title line (image1 / rId8) is not republished.

Thermo Fisher DVIA-MB1000 MB1000 Internal Program Worksheet (P196 · 200925R5) — 2021.01.18

MB1000 P196 handout for DVIA-MB1000 serial 200925R5 with Thermo Fisher–branded target equipment: worksheet image under the title row, transmissibility summary at 2 / 5 / 10 Hz, and Signal-program internal performance plots for Z, X, and Y (DOCX §2a: image1 setup, image2–4 axis plots). Appears in the source filename; END USER, place of installation, and place of measurement cells are blank on the sheet.

Hitachi HT7800 DVIA-MB1000 (200429R5 / P190) Internal Program Performance — Hainan Medical College — 2021.01.13

DVIA-MB1000 P190 serial 200429R5 — MB1000 internal-program handout for Hainan Medical College with Hitachi HT7800; report and measurement dates 2021-01-13. Operator Choi, HyoungMun (DAEIL SYSTEMS). Transmissibility summary table and Z / X / Y program plots (DOCX §2a: media image2–4 under axis headings; centered bitmap after the title line is not republished).

Shenzhen Yan Yi New Materials Zeiss Gemini Sigma 300 DVIA-MB1000 (200918R1 · P192) Remote measurement — Internal program plots — 2021.01.11

DVIA-MB1000 serial 200918R1 (project P192) for Zeiss Gemini sigma300 at Shenzhen 9F for 深圳市研一新材料有限公司, reported in remote tuning handout dated 2021.01.11. Transmissibility summary and MB1000 internal-program Z, X, and Y axis screenshots follow Word order; decorative raster under the “MB1000_200918R1P(192) Set up” title line is not republished.

BOE Tescan solaris X DVIA-MB1000 (201020R2 · P201) Remote tuning — 2020.12.24

DVIA-MB1000 serial 201020R2 (project P201) for Tescan solaris X reported via /channel partner; installation and measurement site lines read BOE on 2020.12.24 with engineer Doohyun Kim. Published plots follow Z, X, and Y axis captions as in Word; the centered decorative photograph inserted immediately under the title line is not republished.

POSTECH Scienta Omicron PEEM DVIA-U700 (P18) Replacement Installation Report — Pohang

DVIA-U700 compact installation worksheet (P18 replacement) at POSTECH Department of Physics with Scienta Omicron-IEF/TOF PEEM at RIST HQ 1st floor. Setup 20.12.18, reporting 20.12.23; operator Choi, Hyoung Mun from DAEIL SYSTEMS; business-trip line 17.12.27~17.12.29. Publication includes overview measurement figures, performance summary plots, U700 internal-program Z/X/Y screenshots, and Octave Band Result (BASE: Floor, TOP: Above Active) Z/X/Y plots in Word segment order (header image1 omitted).