BOE Tescan solaris X DVIA-MB1000 (201020R2 · P201) Remote tuning — 2020.12.24
DVIA-M Series
Installation Report
DVIA-MB1000
201020R2
P201
BOE
TESCAN
Solaris X
Contents
(MB1000_201020R2(P201) Set up)
| Target equipment | Tescan solaris X |
|---|---|
| Place of installation | BOE |
| Remark | Good Performance |
| END USER | BOE |
| Operator: Doohyun Kim | Date of business trip : 17.12.27~17.12.29 |
| Date of setup : 20.12.24 | Date of reporting : 20.12.24 |
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 20.12.24 (Thu)
Operator: Daeil System, Research engineer Doohyun Kim
Place of measurement : BOE
Equipment Model: Tescan solaris X
Measurement conditions and results
Summary of measurement results
| 2 Hz | 5 Hz | 10 Hz | |
|---|---|---|---|
| Z | -24 dB | -20 dB | -26 dB |
| X | -28 dB | -29 dB | -35 dB |
| Y | -20 dB | -24 dB | -36 dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date12-24-2020
Tags
DVIA-M Series
Installation Report
DVIA-MB1000
201020R2
P201
BOE
TESCAN
Solaris X
Related Case Studies

DVIA-M Series
Tier-1 Electronics Component Manufacturer Busan — TESCAN CLARA FE-SEM DVIA-MB1000 (161213R2) installation report — 2026-01-07
01-07-2026Read more

DVIA-M Series
TESCAN AMBER X FIB-SEM DVIA-MB1000 (250718R1) Installation Report
11-18-2025Read more

DVIA-M Series
Korea Institute of Science and Technology (KIST) TESCAN Amber X DVIA-MB1000 Installation Report — 2025.10.28
10-28-2025Read more