Vibration Isolation Case Studies
DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.
Series
Equipment Type
Manufacturer
All Case Studies

Fujian Zijin Liyuan Material Technology Sigma300 DVIA-UB700 (230620R3) Installation Report
DVIA-UB700 (S/N 230620R3) installation report prepared for Fujian Zijin Liyuan Material Technology Co., Ltd.; Sigma300 equipment in Xiamen, China; engineer Youngha Lee. Tuning date 23.07.26 and report written 23.07.27 per worksheet. Publication includes Data and Image: Z/X/Y-axis transmissibility plots and equipment photograph; decorative header bitmap (image1) omitted.

Fujian Zijin Liyuan Material Technology Sigma300 DVIA-U1000 (230620R3) Installation Report — Xiamen
DVIA-U1000 compact installation worksheet (serial 230620R3) for Fujian Zijin Liyuan Material Technology Co., Ltd. with Sigma300 in Xiamen, China. Setup 23.07.26, reporting 23.07.27, business-trip line 17.12.27~17.12.29; engineer Youngha Lee. Overview measurement dated 2023.07.26 (Wednesday). Published setup photo and U1000 internal-program Z / X / Y measurement screens; decorative Word header ribbon (image1) omitted.

Helios G5 DVIA-M1000 (211115R2) Installation Report — Peking University, Beijing
DVIA-M1000 (serial 211115R2) internal-program Z, X, and Y axis screenshots for a Thermofisher Helios G5 at Peking University (installation site BEIJING). The handout includes target equipment and site lines, operator and business-trip dates, Overview with on-site measurement metadata (2023.07.13), and M1000 internal program performance plots only (no VC-Class summary or Octave Band block in the source). Decorative header graphics and the pre-Overview setup raster are omitted from the public page.

Guangdong Everwin Precision Technology Sigma300 DVIA-M1000 (230310R4) Installation Report
DVIA-M1000 handout for serial 230310R4 — Sigma300 at Dongguan. Internal program performance screenshots for Z, X, and Y axes.

ZEISS Crossbeam 550 DVIA-M1000 (230324R4) Installation Report
DVIA-M1000 abbreviated worksheet (serial 230324R4). Setup dated 23.07.20 and reporting dated 23.07.24; measurement date 2023.07.20 (Thursday) in Shenzhen with operator Youngha Lee from DAEIL SYSTEMS. END USER N/A; Target equipment Crossbeam550 and installation site Shenzhen as in the form. The Overview block states the standard DVIA-M1000 sentence only. No vibration specification, equipment status, tuning request, measurement summary table, or Reference section appears in the source. The internal-program section title in the source reads “M1000 internal program performance measurement result”; published figures are three plots labeled Z axis, X axis, and Y axis. Decorative header graphics from the Word file are omitted from public copy.

TESCAN SOLARIS GMH DVIA-M1000 (230501R3-4) Installation Report
DVIA-M1000 abbreviated worksheet (serial 230501R3-4). Setup dated 23.07.21 and reporting dated 23.07.24; measurement date 2023.07.21 (Friday) in Shenzhen with operator Youngha Lee from DAEIL SYSTEMS. END USER N/A; target equipment TESCAN SOLARIS GMH and installation site Shenzhen as in the form. The Overview block states the standard DVIA-M1000 sentence only. No vibration specification, equipment status, tuning request, measurement summary table, or Reference section appears in the source. The internal-program section title in the source reads “M1000 internal program performance measurement result”; published figures are three plots labeled Z axis, X axis, and Y axis. Decorative header graphics from the Word file are omitted from public copy.