Skip to main content

Vibration Isolation Case Studies

DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.

Series

Equipment Type

Manufacturer

All Case Studies

1264 case studies
Jingmen 605 Sigma 300 DVIA-M1000 (230627R4) Installation Report
Installation Report
DVIA-M Series
08-29-2023

Jingmen 605 Sigma 300 DVIA-M1000 (230627R4) Installation Report

DVIA-M1000 abbreviated worksheet (serial 230627R4). Setup and reporting dated 23.08.29; measurement date 2023.08.29 (Tuesday) in Jingmen with operator Youngha Lee from DAEIL SYSTEMS. END USER Jingmen 605; Target equipment Sigma 300 and installation site Jingmen as in the form. The Overview block states the standard DVIA-M1000 sentence only. No vibration specification, equipment status, tuning request, measurement summary table, or Reference section appears in the source. The internal-program section title in the source reads “M1000 internal program performance measurement result”; published figures are three plots labeled Z axis, X axis, and Y axis. Decorative header graphics from the Word file are omitted from public copy.

University of North Dakota TFS HT Tank 200 kV DVIA-MB1000 VEC (220524R4) Installation Report — 2023.08.25

DVIA-MB1000 (serial 220524R4, platform DVIA-MB1000 - 910 x 1140 mm) VEC installation worksheet at University of North Dakota Whitmer Hall with TFS HT Tank 200 kV, tuning date 25 August 2023. Includes UI program transmissibility (Z/X/Y), VEC floor and active VC curves per axis, a transmissibility graph, and vibration results summary (F/D/G). Engineers Youngha Lee and Jongwon Park (DAEIL SYSTEMS). Report written 23.09.06. Reference uses the standard Generic Vibration Criteria markdown table (criterion graphic not republished).

University of North Dakota Thermo Fisher Talos F200X DVIA-MB3000 VEC (221104R3) Installation Report — 2023.08.25

DVIA-MB3000 (serial 221104R3, platform DVIA-MB3000-1370x2020x232H) VEC installation worksheet at University of North Dakota Whitmer Hall with Thermo Fisher Talos F200X, tuning date 25 August 2023. Includes UI program transmissibility (Z/X/Y), VEC measurement plots (transmissibility, floor VC, active VC per axis), and vibration results summary (F/D/G). Engineers Youngha Lee and Jongwon Park (DAEIL SYSTEMS). Report written 23.09.06.

Thermo Fisher Scientific Talos F200X G2 TEM DVIA-MB3000 Installation Report

Thermo Fisher Scientific Talos F200X G2 TEM DVIA-MB3000 Installation

ZEISS Crossbeam 350 DVIA-ML1000 Installation Report (221221R3, Shenzhen)

DVIA-M1000 handout (serial 221221R3) for ZEISS Crossbeam 350 at Shenzhen. Published tables and overview match the form; cover/header decoration is omitted. M1000 internal program performance plots are shown for the Z, X, and Y axes.

Tier-1 Battery Manufacturer Cheongju Cleanroom KEYENCE VK-X3000 DVIA-T45 (230417R5) Service & Vibration Report

DVIA-T45 field service, reboot recovery, and vibration measurement (normal, floor excitation near equipment, optical bench) — August 2023.