Skip to main content
Installation Report
DVIA-ULF Series
07-27-2023

Fujian Zijin Liyuan Material Technology Sigma300 DVIA-U1000 (230620R3) Installation Report — Xiamen

DVIA-U Series
Installation Report
Fujian Zijin Liyuan
Sigma300
DVIA-U1000
230620R3
Xiamen
China

Fujian Zijin Liyuan Material Technology Co., Ltd.

Fujian Zijin Liyuan Material Technology Co., Ltd.

(U1000_ 230620R3 Set up)

Site checklist

Target equipmentSigma300
Place of installationXiamen
RemarkGood Performance
END USERFujian Zijin Liyuan Material Technology Co., Ltd.

Operator and dates

Operator: Lee, Youngha Date of setup: 23.07.26 Date of reporting: 23.07.27Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-U1000 active vibration isolation platform is appropriately installed and functioning as intended. Measurement date: 2023.07.26 (Wednesday), Operator: DAEIL SYSTEMS, Youngha Lee Place of measurement: Xiamen, China Equipment Model: Sigma300

U1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-ULF Series
Date07-27-2023
Tags
DVIA-U Series
Installation Report
Fujian Zijin Liyuan
Sigma300
DVIA-U1000
230620R3
Xiamen
China