Skip to main content

Vibration Isolation Case Studies

DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.

Series

Equipment Type

Manufacturer

All Case Studies

1264 case studies
Jiangsu Shekoy Semiconductor New Material NX5000En DVIA-M3000 (220919R4-2) Installation Report

DVIA-M3000 abbreviated worksheet for serial 220919R4-2 (source M3000_220919R4-2_23.09.20.docx). Target equipment NX5000En with END USER Jiangsu Shekoy Semiconductor New Material Co., Ltd.; installation place Yixing; setup and reporting dated 23.09.20 and 23.09.21 per the form; operator Jongwon Park; measurement dated 2023.09.20 (Wednesday). Overview sentence as printed. Internal-program plots use axis labels Z axis, X axis, and Y axis under the M3000 internal program caption. Decorative bitmap embedded under the company header line was omitted from the public page.

Tier-1 Semiconductor Pyeongtaek P3 Line ADVANTEST E5620 DVIA-P4000 Installation Report

DVIA-P4000 installation report at Tier-1 Semiconductor Pyeongtaek P3 line for ADVANTEST E5620. Tuning September 14, 2023; report written September 19, 2023; engineer Youngha Lee (DAEIL SYSTEMS). Summary VC band table and axis VC curves and transmissibility plots.

Crossbeam550 DVIA-M1000 (230222R2) Shenzhen setup note
Installation Report
DVIA-M Series
09-19-2023

Crossbeam550 DVIA-M1000 (230222R2) Shenzhen setup note

Shenzhen DVIA-M1000 setup handout for serial 230222R2 with Crossbeam550 at (END USER). Reporting block lists operator Park, Jongwon; setup 23.09.07; reporting 23.09.19; and business-trip range 17.12.27~17.12.29. Overview states the DVIA-M1000 platform is appropriately installed and functioning as intended. Measurement note dated 2023.09.07 (Thursday) with DAEIL SYSTEMS operator Jongwon Park; place of measurement Shenzhen. The source is a short worksheet: no vibration specification, equipment status, tuning request, measurement summary table, or Reference section. Internal-program section title reads “M1000 internal program performance measurement result”; published program plots are labeled Z axis, X axis, and Y axis. Decorative cover raster from the Word file is omitted from public copy.

Crossbeam550 DVIA-M1000 (230222R5) Installation Report — Shenzhen

DVIA-M1000 installation report for Crossbeam550 (serial 230222R5) with setup and measurement in Shenzhen. The published form excerpt matches the Word layout; plots are the DVIA-M1000 internal program Z / X / Y axis captures only.

TESCAN SOLARIS GMH DVIA-M1000 (230501R3-5) Set up — Shenzhen
Installation Report
DVIA-M Series
09-19-2023

TESCAN SOLARIS GMH DVIA-M1000 (230501R3-5) Set up — Shenzhen

DVIA-M1000 (serial 230501R3-5) set-up report for TESCAN SOLARIS GMH in Shenzhen. Overview states the active vibration isolation platform is appropriately installed and functioning as intended. Internal program performance screenshots are provided for the Z, X, and Y axes; cover-only artwork is not published.

Crossbeam550 DVIA-M1000 (230522R2) Set up — Shenzhen
Installation Report
DVIA-M Series
09-19-2023

Crossbeam550 DVIA-M1000 (230522R2) Set up — Shenzhen

DVIA-M1000 (serial 230522R2) set-up report for Crossbeam550 in Shenzhen. Overview states the active vibration isolation platform is appropriately installed and functioning as intended. Internal program performance screenshots are provided for the Z, X, and Y axes; cover-only artwork is not published.