DVIA-MO1000 (200914R2, P206) Remote Tuning Installation Report — November 19, 2020
MO1000 internal-program handout for DVIA-MO1000 serial 200914R2 (project P206). Munho Noh (DAEIL SYSTEMS) measured on November 19, 2020 with Dummy target equipment noted on the form; floor transmissibility is summarised at 2, 5, and 10 Hz plus an @30 Hz line, and Z / X / Y MB1000 internal program screenshots are published with the worksheet photograph under the title block.

Remote tuning — Zhejiang Univ. FEI Tecnai TF20 DVIA-MB3000 (200623R1 P13) — 2020.11.05
remote-tuning handout for DVIA-MB3000 serial 200623R1 (platform label P13) at Zhejiang University, Hangzhou, China, with FEI Tecnai TF20 as the stated target equipment. Operator Munho Noh (Daeil System, Research engineer); setup and measurement 2020.11.05; reporting 2020.11.09. Published figures are the MB3000 internal program Z/X/Y performance screens only; the Word header raster under the title line is omitted from the public gallery. The source handout has no Reference / VC criteria appendix.

Southern University of Science and Technology FEI Volumescope2 DVIA-MB1000 (191129R6 · P151) Remote measurement — Internal program plots — 2020.11.02
DVIA-MB1000 serial 191129R6 (project P151) remote worksheet via /channel partner at Southern University of Science and Technology in Shenzhen. Target equipment and Equipment Model both read FEI Volumescope2 per the Word form. Published plots follow Z axis, X axis, and Y axis; the ornamental photo under the centered setup heading is not republished.

Wangxiang ZIESS EVO18 DVIA-MB1000 (170906R4 · P50) Internal program worksheet — 2020.10.21
DVIA-MB1000 internal-program worksheet (platform serial 170906R4, program line MB1000 P50) for ZIESS EVO18 with end user Wangxiang campany in Hangzhou. Operator Doohyun Kim (Daeil System); setup 2020-10-20, measurement 2020-10-20, reporting 2020-10-21; the Overview line, transmissibility summary at 2 / 5 / 10 Hz, and Signal-program captures for Z, X, and Y follow the DOCX verbatim. The large centred graphic directly under the Word title line is omitted as a title-block decorative image.

Wangxiang ZEISS Sigma 300 DVIA-MB1000 MB1000 Internal Program (P179) — 2020.10.21
MB1000 program worksheet 200522R2-3 (P179) for ZEISS Sigma 300 in Hangzhou: setup summary tables, transmissibility summary at 2 / 5 / 10 Hz, and Signal-program internal performance captures for Z, X, and Y. The large centered graphic placed directly under the Word title line is omitted from the public page as a title-block decorative image.
Tier-1 Semiconductor FEI TF20 TEM DVIA-MB3000 (200623R1) Installation Worksheet — 2020.10.21
DVIA-MB3000 (serial 200623R1) active-mount vibration worksheet after TF20-FEI TEM installation at Tier-1 Semiconductor. Measurement date 2020.10.21; internal-program Z/X/Y transmissibility and coherence plots plus installation photograph; summarized frequency picks at 2 Hz, 5 Hz, and 10 Hz with omnidirectional assessment.