Skip to main content

Vibration Isolation Case Studies

DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.

Series

Equipment Type

Manufacturer

All Case Studies

1264 case studies
Xiamen Haichen Zeiss Sigma300 DVIA-MB1000 (P239 · 210820R1) Installation Report — 2021.10.12

DVIA-MB1000 (P239 / internal ref. 210820R1) for Zeiss Sigma300 at Xiamen Haichen — setup and reporting on 2021.10.12, transmissibility summary at 2 / 5 / 10 Hz, and internal-program Z / X / Y plots plus an on-site equipment photograph as in the source.

Huawei TESCAN Solaris GMH DVIA-M1000 Installation Report (MB1000 P249, 210517R4) — 2021.09.29

MB1000 internal-program worksheet (P249, report 210517R4) for TESCAN Solaris GMH with END USER Huawei — transmissibility summary at 2/5/10 Hz and Z/X/Y internal-program plots. Place of installation and place of measurement are N/A on the form.

STM OEM DVIA-MO1000 (P247) Second Setup Installation Report — September 13, 2021

MO1000 internal-program handout for DVIA-MO1000 serial P247 via (second setup). Measurement on 2021-09-10 with summary transmissibility table and Z–X–Y internal program screenshots. Cover-only header raster is omitted from publication.

Thermo Fisher Apreo 2S DVIA-MB1000 (210701R6-2 P242) Installation Report

internal-program handout for DVIA-MB1000 serial 210701R6-2 (platform P242) with Thermo Fisher Scientific Apreo 2S as the target equipment. Operator KIM, DOOHYUN (Daeil System, research engineer); setup and measurement on 2021.08.20; reporting on 2021.09.06. Published figures are the MB1000 internal-program Z/X/Y performance screens only; the Word title-line header raster is omitted from the public gallery. Place of installation and END USER are blank on the form (N/A). The source handout has no Reference / VC criteria appendix.

MB1000 P246 (210701R6-5) internal program worksheet — 2021.09.06

active-mounting worksheet for platform MB1000 P246 serial 210701R6-5 with blank target-equipment lines in the form. Operators Choi HyoungMun and DAEIL SYSTEMS measurement lead; measurement 2021.08.25; setup 2021.08.27; reporting 2021.09.06; template business-trip line 17.12.27~17.12.29. Figures are MO1000 internal-program Z/X/Y axis screens exactly as labeled in the DOCX map; centered title raster under the worksheet heading is omitted. The source worksheet has no Reference / VC appendix.

Hitachi SU8010 DVIA-MB1000 P238 (210708R1-2) internal program handout — 2021.09.06

active-mounting worksheet for platform MB1000 P238 serial 210708R1-2 with HITACHI-SU8010 as the stated target equipment. Operator Choi HyoungMun (Daeil System, research engineer); setup 2021.08.25; reporting 2021.09.06; business trip 17.12.27~17.12.29. Published figures are the MB1000 internal-program Z/X/Y performance screens only; the Word header raster under the title line is omitted from the public gallery. The source handout has no Reference / VC criteria appendix.