Vibration Isolation Case Studies
DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.
Series
Equipment Type
Manufacturer
All Case Studies

Bauman Moscow State Technical University ZEISS Merlin Gemini II DVIA-MB1000 Installation Report — 2022.11.16
DVIA-MB1000 (SN 220825R6-2) at Bauman Moscow State Technical University with Zeiss Merlin Gemini II: engineer field notes, Z/X/Y transmissibility plots, equipment photo, and VC reference table.

Bauman Moscow State Technical University Zeiss Orion DVIA-MB3000 (220825R6-4) Installation Report
DVIA-MB3000 installation report (serial 220825R6-4) prepared for Bauman Moscow State Technical University with Zeiss Orion equipment: Z/X/Y transmissibility graphs, on-site equipment photo, and Generic Vibration Criteria as a markdown table (no separate reference figure). Engineer Youngha Lee (DAEIL SYSTEMS); tuning 22.11.16; report written 23.01.17.

Sigma300 DVIA-M1000 Installation Report (Dongguan, 220118R5, 2022)
Short-field report — DVIA-M1000 220118R5 with Sigma300 at Dongguan: site tables, set-up photograph, and M1000 internal-program Z / X / Y performance captures.

LG Digital Park (Pyeongtaek) DVIA-UD700 (220513R1) Installation Report
DVIA-UD700 (S/N 220513R1, 1400×1000×390H) installation report prepared for LG Digital Park (Pyeongtaek); optical development equipment (광학관련 개발장비); engineers Seounghoon Cheon and Yongha Lee. Tuning date 22.10.31 and report written date 22.11.03 per worksheet. Summary VC-class table (Floor vs Active) and nine Data and Image plots measured with equipment turned off—floor/top VC curves and transmissibility for Z/X/Y; decorative header bitmap (image1) and Reference VC diagram (image11) omitted in favor of the published markdown criteria table.

Shanghai Synchrotron Radiation Facility DVIA-UB700 (211026R3-3) Installation Report
DVIA-UB700 Installation Report (serial 211026R3-3) prepared for Shanghai Synchrotron Radiation Facility; engineer Hosang Yu; tuning October 27, 2022; report written November 2, 2022. Location Shanghai, China; equipment TBD on the form. Overview states the DVIA-UB700 active vibration isolation platform is appropriately installed and functioning as intended. Published figures are Z / X / Y-axis Transmissibility plots and one equipment image. Decorative Word header bitmap (image1) omitted.

Shanghai Synchrotron Radiation Facility Prisma E DVIA-U1000 (211026R3-3) Installation Report — Shanghai
DVIA-U1000 compact installation worksheet (serial 211026R3-3) at Shanghai Synchrotron Radiation Facility with Zeiss Prisma E, Shanghai site. Setup 22.10.27, reporting 22.11.02, business trip 17.12.27~17.12.29; Overview measurement dated 2022.10.27 (Thursday). Publication includes U1000 internal-program Z / X / Y screenshots only; header decoration bitmap (image1) has no publishable equipment photo so the Set up subsection has no image.