Installation Report
DVIA-ULF Series
11-02-2022
Shanghai Synchrotron Radiation Facility DVIA-UB700 (211026R3-3) Installation Report
DVIA-U Series
Installation Report
SSRF
Shanghai Synchrotron Radiation Facility
DVIA-UB700
211026R3-3
Contents
DVIA-UB700 INSTALLATION REPORT
Prepared for
Shanghai Synchrotron Radiation Facility
Prepared by
Engineer: Hosang Yu
Tuning date: 22.10.27
Report written date: 22.11.02
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-UB700 active vibration isolation platform is appropriately installed and functioning as intended.
System Information
Model: DVIA-UB700
Serial Number: 211026R3-3
Engineer
Hosang Yu, from DAEIL SYSTEMS
Tuning Date
October 27, 2022
Location
Shanghai, China
Equipment
TBD
Data and Image
Z-axis (Vertical) Transmissibility
X-axis (Left to Right) Transmissibility
Y-axis (Front to Back) Transmissibility
Equipment image
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-ULF Series
Date11-02-2022
Tags
DVIA-U Series
Installation Report
SSRF
Shanghai Synchrotron Radiation Facility
DVIA-UB700
211026R3-3
Related Case Studies

DVIA-ULF Series
Shanghai Synchrotron Radiation Facility Prisma E DVIA-U1000 (211026R3-3) Installation Report — Shanghai
11-02-2022Read more

DVIA-ULF Series
Shanghai Synchrotron Radiation Facility Prisma E DVIA-U1000 (211026R3-3) Installation Report
10-27-2022Read more

DVIA-ULF Series
BGRIMM TECHNOLOGY GROUP TESCAN VEGA GMS DVIA-UB700 (230202R1) Installation Report
06-12-2023Read more