GEM CO.,Ltd Apreo 2C DVIA-M1000 (220907R2) Installation Report
Installation Report
DVIA-M Series
01-12-2023

GEM CO.,Ltd Apreo 2C DVIA-M1000 (220907R2) Installation Report

DVIA-M1000 abbreviated worksheet (serial 220907R2). Setup dated 22.12.13 and reporting dated 23.01.12; measurement date 2022.12.13 (Tuesday) in HUBEI with operator Youngha Lee from DAEIL SYSTEMS. END USER GEM CO.,Ltd; target equipment Apreo 2C and installation site HUBEI as in the form. The Overview block states the standard DVIA-M1000 sentence only. No vibration specification, equipment status, tuning request, measurement summary table, or Reference section appears in the source. The internal-program section title in the source reads “MB1000 internal program performance measurement result”; published figures are three plots labeled Z axis, X axis, and Y axis. Decorative header graphics, the cover photo before the checklist, and the SET UP title-line bitmap are omitted from public copy.

Crossbeam 300 DVIA-M1000 (221212R2) Installation Report — Aucksun (HUAIAN)

DVIA-M1000 (serial 221212R2) setup summary for Crossbeam 300 at Aucksun, HUAIAN. The source handout includes target equipment and site lines, operator and trip dates, an Overview block with on-site measurement metadata (2023.01.03), and M1000 internal program Z/X/Y axis performance screenshots. Decorative header logo and facility photo before the keyfacts table are omitted; no Reference section in the source.

KIST Olympus IX51 DVIA-UD350-1008M Installation Report
Installation Report
DVIA-ULF Series
01-12-2023

KIST Olympus IX51 DVIA-UD350-1008M Installation Report

DVIA-UD350-1008M-50t-750H (S/N 221004R1) installation report at KIST (Seoul): Floor and active-platform VC curves plus transmissibility with equipment turned off.

KIST Olympus IX51 DVIA-UD350-1008M (221004R2) Installation Report
Installation Report
DVIA-ULF Series
01-12-2023

KIST Olympus IX51 DVIA-UD350-1008M (221004R2) Installation Report

DVIA-UD350-1008M-50t-750H (S/N 221004R2) installation report at KIST (Seoul): tuned January 10, 2023 by Seounghoon Cheon (DAEIL SYSTEMS), reported January 12, 2023. Olympus IX51 microscope; Data Physics Quattro / SignalCalc ACE measurement. Summary VC-class table (Floor vs Active) and nine equipment-off Floor / Top VC and Transmissibility plots (Z/X/Y). Decorative header bitmap (image1) and Reference VC diagram (image11) omitted; Reference uses the standard markdown criteria table.

Sigma300 Shenzhen DVIA-M1000 Installation Report (UNITED BLUEOCEAN, SN 220509R2, 2023-01-10)

UNITED BLUEOCEAN — Sigma300 target tool on DVIA-M1000 (SN 220509R2), installation and measurement in SHENZHEN. VC-class summary table plus MB1000 internal program plots and octave-band results.

Sungkyunkwan University JEOL JBX-8100FX DVIA-P2200 (220509R3) Installation Report

DVIA-P2200 (serial 220509R3) installation at Sungkyunkwan University Research Building for JEOL JBX-8100FX electron beam lithography. Engineers Hosang Yu and Youngha Lee; tuning January 9, 2023; report written January 12, 2023. Overview states the platform is appropriately installed and functioning as intended. Summary VC grades (floor vs active) and Z/X/Y VC curves from the installation handout.