Vibration Isolation Case Studies
DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.
Series
Equipment Type
Manufacturer
All Case Studies

Zhejiang University SU8010 DVIA-M1000 Installation Report (230404R2-1, 2023.05)
DVIA-M1000 installation report — Zhejiang University, equipment SU8010. MB1000 internal program performance screenshots (Z, X, Y) and installation site photograph; abbreviated field report layout without measurement summary table or Reference appendix in the source.

Hitachi HT7700 DVIA-M1000 (230404R2-2) Zhejiang University Setup Handout
Short setup handout for serial 230404R2-2 (DVIA-M1000 wording per source) with Hitachi HT7700 at Zhejiang University, Hangzhou. Reporting block lists operator Yu Ho Sang, setup 23.05.23, reporting 23.05.29, and a business-trip date range 17.12.27~17.12.29. Overview states the platform is appropriately installed and functioning as intended. Measurement note dated 2023.05.23 (Tuesday) with DAEIL SYSTEMS operator Hosang Yu; place of measurement Shanghai; equipment model HT7700. Published imagery: lab/equipment photo and MB1000 internal program Z, X, and Y axis performance plots. Decorative cover ribbon raster omitted.

Sun Yat-sen University EA1400 DVIA-M-JT2 (220126R7-3) Installation Report
DVIA-M-JT2 onboard worksheet for serial 220126R7-3. Target equipment EA1400 with END USER Sun Yat-sen University; installation place GUANGDONG; setup and reporting dated 23.05.09 and 23.05.22 per the form; operator Lee, Young Ha; measurement dated 2023.05.09 (Tuesday) with DAEIL SYSTEMS, Youngha Lee. Overview sentence as printed. Internal program section publishes Z, X, and Y axis plots only; header-band decorative rasters before the checklist and under the setup title were omitted from the public page.

SU8600 SEM DVIA-M1000 Internal Program Performance Report — Wenzhou Medical University (Zhejiang, 2023)
Commissioning-format Wenzhou Medical University / Zhejiang memo (SN 221202R9): field equipment photograph and MB1000 internal-program Z/X/Y-axis measurement screenshots from the Signal program.

Vanchip Gemini560 DVIA-M1000 (230403R2) Installation Report
DVIA-M1000 field report (serial 230403R2) for Vanchip with Gemini560 in Shanghai. Abbreviated handout: cover context, Overview, measurement particulars, then MB1000 internal-program performance screenshots for Z, X, and Y; header-only graphics from the DOCX cover are omitted from publication.

Tan Kah Kee Innovation Laboratory Bonder DVIA-P7000 (221018R3) Installation Report
DVIA-P7000 worksheet (serial 221018R3) for Bonder at Tan Kah Kee Innovation Laboratory, Xiamen. Setup dated 23.05.17 and reporting dated 23.05.19; measurement date 2023.05.17 (Wednesday) in XIAMEN with operator Youngha Lee from DAEIL SYSTEMS. Summary VC grid covers equipment turned off and turned on; published figures follow P7000 internal program (equipment off), Octave Band Result (equipment off), and equipment-on VC plots per §2a embed mapping. Decorative header raster (image1) omitted; no Vibration specification or Reference headings in the source.