Vibration Isolation Case Studies
DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.
Series
Equipment Type
Manufacturer
All Case Studies

DFDCHEM Guangxi Sigma300 DVIA-UB700 Installation Report
DVIA-U1000-910×1140 mm (S/N 220919R7) installation report prepared for DFDCHEM, Guangxi, China, with Sigma300 equipment — tuning 23.06.12 per worksheet, report written 23.06.13. Publication includes Z/X/Y-axis transmissibility plots and an on-site equipment photograph; header cover bitmap omitted.

DFDCHEM Guangxi Sigma300 DVIA-U1000 (220919R7) Installation Report — Guangxi
DVIA-U1000 compact installation worksheet (serial 220919R7) at DFDCHEM with Sigma300 in Guangxi, China. Setup 23.06.12, reporting 23.06.13, business-trip line 17.12.27~17.12.29; Overview measurement dated 2023.06.12 (Monday). Publication includes equipment setup photograph and U1000 internal-program Z / X / Y screenshots. Decorative header bitmap (image1.png) omitted.

Fudan University Shanghai STM DVIA-MO1000 (221114R2) Installation Report — June 13, 2023
DVIA-MO1000 handout (serial 221114R2) for STM at Fudan University, Shanghai. Published tables and overview match the form; cover/header rasters are omitted. MO1000 internal program performance plots are shown for the Z, X, and Y axes. Reference uses the standard Generic Vibration Criteria markdown table only.

HUAI HONG DA Sigma 300 DVIA-M1000 (230417R8) Installation Report
DVIA-M1000 abbreviated worksheet (serial 230417R8). Setup dated 23.06.06 and reporting dated 23.06.13; measurement date 2023.06.06 (Tuesday) in Changzhou with operator Youngha Lee from DAEIL SYSTEMS. END USER HUAI HONG DA; Target equipment Sigma 300 and installation site CHANGZHOU as in the form. The Overview block states the standard DVIA-M1000 sentence only. No vibration specification, equipment status, tuning request, measurement summary table, or Reference section appears in the source. The internal-program section title in the source reads “MB1000 internal program performance measurement result”; published figures are three plots labeled Z axis, X axis, and Y axis. Decorative header graphics from the Word file are omitted from public copy.

Anhui GOLD STAR Titanium Dioxide Apreo 2S HiVac DVIA-M1000 (220718R5) Installation Report
DVIA-M1000 abbreviated worksheet (serial 220718R5). Setup dated 23.05.30 and reporting dated 23.06.12; measurement date 2023.05.30 (Tuesday) in ANHUI with operator Hosang Yu from DAEIL SYSTEMS. END USER Anhui GOLD STAR Titanium DIOXIDE(Group) Co., Ltd.; target equipment Apreo 2S HiVac and installation site ANHUI as in the form. The Overview block states the standard DVIA-M1000 sentence only. No vibration specification, equipment status, tuning request, measurement summary table, or Reference section appears in the source. The internal-program section title in the source reads “MB1000 internal program performance measurement result”; published figures are three plots labeled Z axis, X axis, and Y axis. Decorative header graphics and the setup bitmap under the “Set up” line are omitted from public copy.

BGRIMM TECHNOLOGY GROUP TESCAN VEGA GMS DVIA-UB700 (230202R1) Installation Report
DVIA-UB700 (serial 230202R1) installation report prepared for BGRIMM TECHNOLOGY GROUP with TESCAN VEGA GMS in Xiamen, China. Tuning date 23.06.07; report written 23.06.12. Publication includes Z / X / Y-axis transmissibility plots and an equipment photograph. Decorative header bitmap from the Word cover block is omitted.