Installation Report
DVIA-ULF Series
06-13-2023
DFDCHEM Guangxi Sigma300 DVIA-UB700 Installation Report
DVIA-ULF Series
Installation Report
DFDCHEM
Guangxi
Sigma300
DVIA-UB700
DVIA-U1000
220919R7
Contents
Prepared for
DFDCHEM
Prepared by
Engineer: Youngha Lee
Tuning date: 23.06.12
Report written date: 23.06.13
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-U1000 active vibration isolation platform is appropriately installed and functioning as intended.
System Information
Model: DVIA-U1000-910x1140 mm
Serial Number: 220919R7
Engineer
Youngha Lee, from DAEIL SYSTEMS
Tuning Date
June 12, 2023
Location
GUANGXI, China
Equipment
Sigma300
Data and Image
Z-axis (Vertical) Transmissibility
X-axis (Left to Right) Transmissibility
Y-axis (Front to Back) Transmissibility
Equipment image
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-ULF Series
Date06-13-2023
Tags
DVIA-ULF Series
Installation Report
DFDCHEM
Guangxi
Sigma300
DVIA-UB700
DVIA-U1000
220919R7
Related Case Studies

DVIA-ULF Series
DFDCHEM Guangxi Sigma300 DVIA-U1000 (220919R7) Installation Report — Guangxi
06-13-2023Read more

DVIA-ULF Series
HFIPS Sigma300 DVIA-UB700 Installation Report
09-11-2023Read more

DVIA-ULF Series
Fujian Zijin Liyuan Material Technology Sigma300 DVIA-UB700 (230620R3) Installation Report
07-27-2023Read more