Installation Report
DVIA-ULF Series
01-12-2024

whchem Huaian Sensofar s neox DVIA-UD350-0911M-50t-800H (231019R3) Installation Report

DVIA-U Series
Installation Report
whchem
Huaian
Sensofar
s neox
DVIA-UD350
231019R3

whchem

whchem

(UD350_ 231019R3 Set up)

Site checklist

Target equipmentSensofar s neox
Place of installationHuaian
RemarkGood Performance
END USERwhchem

Operator and dates

Operator: Park, Jongwon Date of setup: 24.01.08 Date of reporting: 24.01.12Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-UD350 active vibration isolation platform is appropriately installed and functioning as intended. Measurement date: 2024.01.08 (Monday), Operator: DAEIL SYSTEMS, Jongwon Park Place of measurement: Huaian Equipment Model: Sensofar 3D Optical profiler s neox

UD350 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-ULF Series
Date01-12-2024
Tags
DVIA-U Series
Installation Report
whchem
Huaian
Sensofar
s neox
DVIA-UD350
231019R3