Installation Report
DVIA-ULF Series
07-27-2022
COPPRO Chengdu ZEISS EVO10 DVIA-UB1000 (220310R1) Installation Report
DVIA-U Series
Installation Report
COPPRO
Chengdu
ZEISS
EVO10
DVIA-UB1000
DVIA-U1000
220310R1
Contents
COPPRO( 成都振芯科技股份有限公司)
COPPRO( 成都振芯科技股份有限公司)
(U1000_ 220310R1 Set up)
Site checklist
| Target equipment | ZEISS EVO10 |
|---|---|
| Place of installation | CHENGDU |
| Remark | Good Performance |
| END USER | COPPRO( 成都振芯科技股份有限公司) |
Operator and dates
| Operator: Lee, Youngha Date of setup : 22.07.26 Date of reporting : 22.07.27 | Date of business trip : 17.12.27~17.12.29 |
|---|
Overview
Overview
The DVIA-UB1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2022.07.26 (Tuesday),
Operator: DAEIL SYSTEMS, Youngha Lee
Place of measurement: CHENGDU, China
Equipment Model: ZEISS EVO10
Measurement conditions and results
Summary of measurement results
| Test Condition | VC-Class |
|---|---|
| Z | |
| Floor | C |
| Above Active | E |
Good omnidirectional performance.
UB1000 internal program performance measurement result - Z axis
UB1000 internal program performance measurement result - X axis
UB1000 internal program performance measurement result - Y axis
Octave Band Result - Z axis
Octave Band Result - X axis
Octave Band Result - Y axis
Result-Imeage - Active Off
Result-Imeage - Active On
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-ULF Series
Date07-27-2022
Tags
DVIA-U Series
Installation Report
COPPRO
Chengdu
ZEISS
EVO10
DVIA-UB1000
DVIA-U1000
220310R1
Related Case Studies

DVIA-ULF Series
COPPRO ZEISS EVO10 DVIA-UB700 (220310R1) Installation Report — Chengdu, China
07-27-2022Read more

DVIA-ULF Series
Shanghai Tight Welding Institute ZEISS SEM EVO10 DVIA-U1000 (241217R6) Installation Report — Shanghai
04-17-2025Read more

DVIA-ULF Series
Goertek Inc. Sigma300 DVIA-UB1000 (220919R6-1) Installation Report — Shanghai
06-13-2023Read more