Installation Report
DVIA-ULF Series
04-17-2025
Shanghai Tight Welding Institute ZEISS SEM EVO10 DVIA-U1000 (241217R6) Installation Report — Shanghai
DVIA-U Series
Installation Report
Shanghai Tight Welding Institute
ZEISS
EVO10
SEM
Shanghai
DVIA-U1000
241217R6
Contents
Shanghai Tight Welding Institute
Shanghai Tight Welding Institute
(U1000_ 241217R6 Set up)
Site checklist
| Target equipment | EVO10 |
|---|---|
| Place of installation | Shanghai |
| Remark | Good Performance |
| END USER | Shanghai Tight Welding Institute |
Operator and dates
| Operator: Jonghwa Suh Date of setup: 25.04.17 Date of reporting: 25.04.18 | Date of business trip : 17.12.27~17.12.29 |
|---|
Overview
The DVIA-U1000 active vibration isolation platform is appropriately installed and functioning as intended. Vibration Isolation System Information Model: DVIA-U1000 Serial Number: 241217R6 Measurement date: 2025.04.17 (Thursday) Operator: Jonghwa Suh from DAEIL SYSTEMS Place of measurement: Shanghai End User: Shanghai Tight Welding Institute Equipment Model Manufacturer: ZEISS Equipment: SEM Model: EVO10
U1000 internal program performance measurement result
Vertical
Left to Right
Front to Back
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-ULF Series
Date04-17-2025
Tags
DVIA-U Series
Installation Report
Shanghai Tight Welding Institute
ZEISS
EVO10
SEM
Shanghai
DVIA-U1000
241217R6
Related Case Studies

DVIA-ULF Series
XZZJS ZEISS SEM DVIA-U1000 (200828R3) Installation Report — Shanghai
12-19-2022Read more

DVIA-ULF Series
Shanghai ZEISS Sigma360 DVIA-U1000 (250114R3) Installation Report
04-18-2025Read more

DVIA-ULF Series
Shenzhen BYD EVO 10 DVIA-U1000 (241120R3) Installation Report — Shenzhen
03-18-2025Read more