Installation Report
DVIA-ULF Series
06-13-2023

Goertek Inc. Sigma300 DVIA-UB1000 (220919R6-1) Installation Report — Shanghai

DVIA-U Series
Installation Report
Goertek
Shanghai
ZEISS
Sigma300
DVIA-UB1000
DVIA-U1000
220919R6-1

Goertek Inc.

Goertek Inc.

(U1000_ 220919R6-1 Set up)

Site checklist

Target equipmentSigma300
Place of installationshanghai
RemarkGood Performance
END USERGoertek Inc.

Operator and dates

Operator: Lee, Youngha Date of setup: 23.06.13 Date of reporting: 22.06.20Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-UB1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2023.06.13 (Tuesday),

Operator: DAEIL SYSTEMS, Youngha Lee

Place of measurement: shanghai, China

Equipment Model: Sigma300

UB1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-ULF Series
Date06-13-2023
Tags
DVIA-U Series
Installation Report
Goertek
Shanghai
ZEISS
Sigma300
DVIA-UB1000
DVIA-U1000
220919R6-1