Installation Report
DVIA-ULF Series
06-13-2023
Goertek Inc. Sigma300 DVIA-UB1000 (220919R6-1) Installation Report — Shanghai
DVIA-U Series
Installation Report
Goertek
Shanghai
ZEISS
Sigma300
DVIA-UB1000
DVIA-U1000
220919R6-1
Contents
Goertek Inc.
Goertek Inc.
(U1000_ 220919R6-1 Set up)
Site checklist
| Target equipment | Sigma300 |
|---|---|
| Place of installation | shanghai |
| Remark | Good Performance |
| END USER | Goertek Inc. |
Operator and dates
| Operator: Lee, Youngha Date of setup: 23.06.13 Date of reporting: 22.06.20 | Date of business trip : 17.12.27~17.12.29 |
|---|
Overview
The DVIA-UB1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2023.06.13 (Tuesday),
Operator: DAEIL SYSTEMS, Youngha Lee
Place of measurement: shanghai, China
Equipment Model: Sigma300
UB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-ULF Series
Date06-13-2023
Tags
DVIA-U Series
Installation Report
Goertek
Shanghai
ZEISS
Sigma300
DVIA-UB1000
DVIA-U1000
220919R6-1
Related Case Studies

DVIA-ULF Series
Goertek Inc. ZEISS Sigma 300 DVIA-U1000 (220919R6-1) Installation Report
01-07-2026Read more

DVIA-ULF Series
Shanghai NIO Automobile ZEISS Sigma300 DVIA-UB1000 (220113R2) Installation Report
07-18-2022Read more

DVIA-ULF Series
Shanghai ZEISS Sigma360 DVIA-U1000 (250114R3) Installation Report
04-18-2025Read more