Installation Report
DVIA-ULF Series
10-13-2021
NSK Guangzhou Zeiss Sigma300 UB1000 P17 Remote Tuning Installation Report (210325R6, 2021-10-13)
DVIA-U Series
Installation Report
恩斯克
NSK
Zeiss
Sigma300
UB1000
210325R6
Remote tuning
DVIA-UB1000
P17
guangzhou
Contents
Site checklist
| Target equipment | Zeiss Sigma300 |
|---|---|
| Place of installation | guangzhou |
| Remark | Good Performance |
| END USER | 恩斯克 |
Operator and dates
| Operator: Kim, Doohyun Date of setup : 21.10.13Date of reporting : 21.10.13 | Date of business trip : 17.12.27~17.12.29 |
|---|
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 21.10.13 (WED)
Operator: Daeil System, Research engineer Kim, Doohyun
Place of measurement : guangzhou, 恩斯克
Equipment Model: Zeiss Sigma300
Summary of measurement results
| Test Condition | Transmissibility | ||
|---|---|---|---|
| 2 Hz | 3 Hz | 10 Hz | |
| Z | -3.5 dB | -12.2 dB | -25 dB |
| X | -5.2 dB | -12.2 dB | -24 dB |
| Y | -6.5 dB | -12.8 dB | -30 dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-ULF Series
Date10-13-2021
Tags
DVIA-U Series
Installation Report
恩斯克
NSK
Zeiss
Sigma300
UB1000
210325R6
Remote tuning
DVIA-UB1000
P17
guangzhou
Related Case Studies

DVIA-ULF Series
YIMO Hitachi S-4800 UB1000 P24 Remote Tuning Installation Report (210302R1, 2021-08-26)
08-26-2021Read more

DVIA-ULF Series
YIMO ZEISS EVO10 UB1000 P16 Remote Tuning Installation Report (190923R7, 2020-08-24)
08-24-2020Read more

DVIA-ULF Series
Little Swan UB1000 P6 China Business Trip Report — Zeiss EVO 18 SEM (2018-05-10)
05-14-2018Read more