Installation Report
DVIA-P Series
05-26-2026
Opton ZEISS EVO 15 UB700 P3 Setup Report (181218)
DVIA-P Series
Installation Report
Opton
ZEISS
EVO 15
UB700
P3
VC-Class
MB1000
China
Contents
Target equipment
Zeiss EVO 15
Place of installation
1F, opton
Remark
Good performance
END USER
opton
Business trip
Operator: Choi, Sung Won
Date of business trip: 18.12.21
Date of reporting: 18.12.26
Installation result summary
| Test Direction | VC-Class | Base | Top |
|---|---|---|---|
| ACTIVE | Z | D | G |
| X | D | G | |
| Y | D | G |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Vibration environment measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-P Series
Date05-26-2026
Tags
DVIA-P Series
Installation Report
Opton
ZEISS
EVO 15
UB700
P3
VC-Class
MB1000
China


