Installation Report
DVIA-ULF Series
10-25-2022
JINSHA SITE MUSEUM Chengdu ZEISS EVO18 DVIA-U1000 (160628R6) Installation Report
DVIA-U Series
Installation Report
JINSHA SITE MUSEUM
ZEISS
EVO18
Chengdu
DVIA-U1000
160628R6
China
Contents
JINSHA SITE MUSEUM
JINSHA SITE MUSEUM
(U1000_ 160628R6 Set up)
Site checklist
| Target equipment | ZEISS EVO18 |
|---|---|
| Place of installation | Chengdu |
| Remark | Good Performance |
| END USER | JINSHA SITE MUSEUM |
Operator and dates
| Operator: Lee, Youngha Date of setup : 22.10.24 Date of reporting : 22.10.25 | Date of business trip : 17.12.27~17.12.29 |
|---|
Overview
The DVIA-U1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2022.10.24 (Monday),
Operator: DAEIL SYSTEMS, Youngha Lee
Place of measurement: Chengdu, China
Equipment Model: ZEISS EVO18
U1000 internal program performance measurement result - Z axis
U1000 internal program performance measurement result - X axis
U1000 internal program performance measurement result - Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-ULF Series
Date10-25-2022
Tags
DVIA-U Series
Installation Report
JINSHA SITE MUSEUM
ZEISS
EVO18
Chengdu
DVIA-U1000
160628R6
China
Related Case Studies

DVIA-ULF Series
JINSHA SITE MUSEUM Chengdu ZEISS EVO18 DVIA-UB700 (160628R6) Installation Report
10-25-2022Read more

DVIA-ULF Series
COPPRO Chengdu ZEISS EVO10 DVIA-UB1000 (220310R1) Installation Report
07-27-2022Read more

DVIA-ULF Series
Shenzhen BYD Lithium Battery ZEISS Sigma 360 DVIA-U1000 (250107R2) Installation Report
05-18-2026Read more