Skip to main content
Installation Report
DVIA-ULF Series
10-25-2022

JINSHA SITE MUSEUM Chengdu ZEISS EVO18 DVIA-U1000 (160628R6) Installation Report

DVIA-U Series
Installation Report
JINSHA SITE MUSEUM
ZEISS
EVO18
Chengdu
DVIA-U1000
160628R6
China

JINSHA SITE MUSEUM

JINSHA SITE MUSEUM

(U1000_ 160628R6 Set up)

Site checklist

Target equipmentZEISS EVO18
Place of installationChengdu
RemarkGood Performance
END USERJINSHA SITE MUSEUM

Operator and dates

Operator: Lee, Youngha Date of setup : 22.10.24 Date of reporting : 22.10.25Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-U1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2022.10.24 (Monday),

Operator: DAEIL SYSTEMS, Youngha Lee

Place of measurement: Chengdu, China

Equipment Model: ZEISS EVO18

U1000 internal program performance measurement result - Z axis

U1000 internal program performance measurement result - X axis

U1000 internal program performance measurement result - Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-ULF Series
Date10-25-2022
Tags
DVIA-U Series
Installation Report
JINSHA SITE MUSEUM
ZEISS
EVO18
Chengdu
DVIA-U1000
160628R6
China