Vibration Isolation Case Studies
DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.
Series
Equipment Type
Manufacturer
All Case Studies

DVIA-MB1000 SN 190117R3 — Internal program measurement graphics (2019-07-24)
DVIA-MB1000 serial 190117R3 internal-program plots: transmissibility (Z / X / Y), 1/3-octave-band spectra, displacement spectral density (Z / X / Y), and Z-axis displacement spectral density comparison (floor–chamber top, floor–isolator top, isolator top–chamber top).

MFLEX Suzhou ZEISS Sigma500 DVIA-MB1000 (190109R5) Installation worksheet — 2019.06.27
DVIA-MB1000 platform serial 190109R5 at MFLEX Suzhou MFC3 (ZEISS Sigma500). Setup 2019-06-25, reporting 2019-06-27 per the Word worksheet; VC-class summary table, MB1000 internal-program Z/X/Y plots, and octave-band Z/X/Y plots (floor vs above active) are published from DOCX §2a mapping. The black title-strip raster (image1) is omitted as decorative; the MFLEX Suzhou exterior photograph follows the setup heading.

Nissan Chemical Helios G4 UC DVIA-MB1000 Installation Report (SN 190531R3, 2019-06-27)
Helios G4 UC on DVIA-MB1000 serial 190531R3 at Nissan Chemical F1 — measurement 2019-06-24, report 2019-06-27. Published imagery: equipment photograph, MB1000 internal program Z / X / Y plots, and octave band (Floor vs Above Active) plots for each axis.

Nissan Chemical Helios G4 UC DVIA-MB1000 Installation Report — MB1000 P124 (2019-06-27)
China trip report for MB1000 project P124 at Nissan Chemical F1 with Thermo Fisher Scientific Helios G4 UC. Trip date 2019-06-24; report dated 2019-06-27. Published imagery: site/equipment photograph, MB1000 internal program Z / X / Y results, and vibration environment measurement Z / X / Y plots.

MFLEX Suzhou ZEISS Sigma500 DVIA-MB1000 (MB1000 P109) China business trip worksheet — 2019.06.27
Korean-format China business-trip worksheet MB1000 P109 for DVIA-MB1000 with target equipment ZEISS Sigma500 at MFLEX Suzhou MFC3 F4 (end user MFLEX). Business trip 19.06.25; operator line names Choi, Sungwon; report dated 19.06.27. The public page publishes the installation photograph embedded after the title block (DOCX Word image2, §2a; 1136×498), MB1000 internal-program screenshots Z / X / Y (image3–5), and vibration-environment plots Z / X / Y (image6–8). The narrow decorative title-strip bitmap Word image1 (471×214) is omitted.

Thermofisher Scientific Helios G4 UC DualBeam HR-S/TEM DVIA-MB1000 Installation Report
Thermofisher Scientific Helios G4 UC DualBeam HR-S/TEM