Installation Report
DVIA-ULF Series
11-25-2020
Tier-1 Semiconductor Newport I-250 Series DVIA-UD350 P24 Installation Report — Suwon
DVIA-U Series
Installation Report
Tier-1 Semiconductor
Newport
I-250 Series
DVIA-UD350
P24
Suwon
Contents
Tier-1 Semiconductor Suwon
Tier-1 Semiconductor Suwon
(UD350_ P24)
Newport I-250 Series
<Newport I-250 Series>
Operator and dates
| Operator: Choi, Hyoung Mun Date of setup : 20.11.24Date of reporting : 20.11.25 | Date of business trip : 17.12.27~17.12.29 |
|---|
Octave Band Result (UD350 TOP vs Newport Top)
Z axis (UD350 TOP vs Newport Top)
X axis (UD350 TOP vs Newport Top)
Y axis (UD350 TOP vs Newport Top)
Octave Band Result (UD350 TOP vs Newport Top simultaneous measurement)
Z axis (simultaneous measurement)
X axis (simultaneous measurement)
Y axis (simultaneous measurement)
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-ULF Series
Date11-25-2020
Tags
DVIA-U Series
Installation Report
Tier-1 Semiconductor
Newport
I-250 Series
DVIA-UD350
P24
Suwon
Related Case Studies
DVIA-ULF Series
Tier-1 Semiconductor Sensofar S neox DVIA-UD350 (P24) Installation Report
11-23-2020Read more

DVIA-ULF Series
YIMO DVIA-UD350 (210929R1, P26) OLIMPUS remote tuning worksheet — UD350 internal Z / X / Y program plots
05-26-2026Read more

DVIA-ULF Series
Korea Institute of Science and Technology (L7-222) Olympus BX51 DVIA-UD350 (220127R1-2) Installation Report
12-31-2024Read more