Skip to main content
Installation Report
DVIA-ULF Series
11-25-2020

Tier-1 Semiconductor Newport I-250 Series DVIA-UD350 P24 Installation Report — Suwon

DVIA-U Series
Installation Report
Tier-1 Semiconductor
Newport
I-250 Series
DVIA-UD350
P24
Suwon

Tier-1 Semiconductor Suwon

Tier-1 Semiconductor Suwon

(UD350_ P24)

Newport I-250 Series

<Newport I-250 Series>

Operator and dates

Operator: Choi, Hyoung Mun Date of setup : 20.11.24Date of reporting : 20.11.25Date of business trip : 17.12.27~17.12.29

Octave Band Result (UD350 TOP vs Newport Top)

Z axis (UD350 TOP vs Newport Top)

X axis (UD350 TOP vs Newport Top)

Y axis (UD350 TOP vs Newport Top)

Octave Band Result (UD350 TOP vs Newport Top simultaneous measurement)

Z axis (simultaneous measurement)

X axis (simultaneous measurement)

Y axis (simultaneous measurement)

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-ULF Series
Date11-25-2020
Tags
DVIA-U Series
Installation Report
Tier-1 Semiconductor
Newport
I-250 Series
DVIA-UD350
P24
Suwon