Skip to main content
Installation Report
DVIA-ULF Series
12-19-2022

XZZJS ZEISS SEM DVIA-U1000 (200828R3) Installation Report — Shanghai

DVIA-U Series
Installation Report
XZZJS
ZEISS
SEM
Shanghai
Xuzhou
DVIA-U1000
200828R3

XZZJS

XZZJS

(U1000_ 200828R3 Set up)

Site checklist

Target equipmentZEISS SEM
Place of installationShanghai
RemarkGood Performance
END USERXZZJS

Operator and dates

Operator: Yu, Ho Sang Date of setup : 22.12.13 Date of reporting : 22.12.19Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-U1000 active vibration isolation platform is appropriately installed and functioning as intended. Measurement date: 2022.12.13 (Tuesday), Operator: DAEIL SYSTEMS, Hosang Yu Place of measurement: Xuzhou, China Equipment Model: ZEISS SEM

U1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-ULF Series
Date12-19-2022
Tags
DVIA-U Series
Installation Report
XZZJS
ZEISS
SEM
Shanghai
Xuzhou
DVIA-U1000
200828R3