Skip to main content
Installation Report
DVIA-ULF Series
02-20-2025

Shenzhen BYD ZEISS Sigma 360 DVIA-U1000 (240308R3) Installation Report — Shenzhen

DVIA-U Series
Installation Report
BYD
Shenzhen
ZEISS
Sigma 360
FE-SEM
DVIA-U1000
240308R3

Shenzhen BYD

Shenzhen BYD

(U1000_ 240308R3 Set up)

Site checklist

Target equipmentSigma 360
Place of installationShenzhen BYD
RemarkGood Performance
END USERShenzhen BYD

Operator and dates

Operator: Chaewon Lee, Jonghwa Suh Date of setup: 25.02.20 Date of reporting: 25.02.20Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-U1000 active vibration isolation platform is appropriately installed and functioning as intended. Measurement date: 2025.02.20 (Thursday), Operator: DAEIL SYSTEMS Chaewon Lee, Jonghwa Suh Place of measurement: Shenzhen End User: Shenzhen BYD Equipment Model: Manufacturer: ZEISS Equipment: FE-SEM Model: Sigma 360

U1000 internal program performance measurement result

Vertical

Left to Right

Front to Back

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-ULF Series
Date02-20-2025
Tags
DVIA-U Series
Installation Report
BYD
Shenzhen
ZEISS
Sigma 360
FE-SEM
DVIA-U1000
240308R3