Installation Report
DVIA-ULF Series
02-20-2025
Shenzhen BYD ZEISS Sigma 360 DVIA-U1000 (240308R3) Installation Report — Shenzhen
DVIA-U Series
Installation Report
BYD
Shenzhen
ZEISS
Sigma 360
FE-SEM
DVIA-U1000
240308R3
Contents
Shenzhen BYD
Shenzhen BYD
(U1000_ 240308R3 Set up)
Site checklist
| Target equipment | Sigma 360 |
|---|---|
| Place of installation | Shenzhen BYD |
| Remark | Good Performance |
| END USER | Shenzhen BYD |
Operator and dates
| Operator: Chaewon Lee, Jonghwa Suh Date of setup: 25.02.20 Date of reporting: 25.02.20 | Date of business trip : 17.12.27~17.12.29 |
|---|
Overview
The DVIA-U1000 active vibration isolation platform is appropriately installed and functioning as intended. Measurement date: 2025.02.20 (Thursday), Operator: DAEIL SYSTEMS Chaewon Lee, Jonghwa Suh Place of measurement: Shenzhen End User: Shenzhen BYD Equipment Model: Manufacturer: ZEISS Equipment: FE-SEM Model: Sigma 360
U1000 internal program performance measurement result
Vertical
Left to Right
Front to Back
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-ULF Series
Date02-20-2025
Tags
DVIA-U Series
Installation Report
BYD
Shenzhen
ZEISS
Sigma 360
FE-SEM
DVIA-U1000
240308R3
Related Case Studies

DVIA-ULF Series
Shenzhen BYD Lithium Battery ZEISS Sigma 360 DVIA-U1000 (250107R2) Installation Report
05-18-2026Read more

DVIA-ULF Series
Shenzhen BYD EVO 10 DVIA-U1000 (241120R3) Installation Report — Shenzhen
03-18-2025Read more

DVIA-ULF Series
Liupan Mountain Laboratory ZEISS Sigma 360 FE-SEM DVIA-U700 (241115R3) Installation Report — Yinchuan
07-14-2025Read more