Installation Report
DVIA-ULF Series
08-11-2022
CRRC Qishuyan Locomotive & Rolling Stock Technology Research Institute ZEISS SIGMA 300 DVIA-UB1000 (220302R3) Installation Report — Changzhou
DVIA-U Series
Installation Report
CRRC
ZEISS
SIGMA 300
Changzhou
DVIA-UB1000
220302R3
Contents
CRRC Qishuyan Locomotive & Rolling Stock Technology Research Institute Co., Ltd.
CRRC Qishuyan Locomotive & Rolling Stock Technology Research Institute Co., Ltd.
(U1000_ 220302R3 Set up)
Site checklist
| Target equipment | ZEISS SIGMA 300 |
|---|---|
| Place of installation | CHANGZHOU |
| Remark | Good Performance |
| END USER | CRRC Qishuyan Locomotive & Rolling Stock Technology Research Institute Co., Ltd. |
Operator and dates
| Operator: Lee, Youngha Date of setup : 22.08.05 Date of reporting : 22.08.11 | Date of business trip : 17.12.27~17.12.29 |
|---|
Overview
The DVIA-UB1000 active vibration isolation platform is appropriately installed and functioning as intended. Measurement date: 2022.08.05 (Monday), Operator: DAEIL SYSTEMS, Youngha Lee, Hosang Yu Place of measurement: CHANGZHOU, China Equipment Model: ZEISS SIGMA 300
U1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-ULF Series
Date08-11-2022
Tags
DVIA-U Series
Installation Report
CRRC
ZEISS
SIGMA 300
Changzhou
DVIA-UB1000
220302R3
Related Case Studies

DVIA-ULF Series
Goertek Inc. Sigma300 DVIA-UB1000 (220919R6-1) Installation Report — Shanghai
06-13-2023Read more

DVIA-ULF Series
CRRC Qishuyan Locomotive & Rolling Stock Technology Research Institute ZEISS SIGMA 300 DVIA-UB700 (220302R3) Installation Report
08-06-2022Read more

DVIA-ULF Series
COPPRO Chengdu ZEISS EVO10 DVIA-UB1000 (220310R1) Installation Report
07-27-2022Read more