Skip to main content
Installation Report
DVIA-ULF Series
12-19-2022

XZZJS ZEISS SEM DVIA-UB700 (200828R3) Installation Report — Xuzhou

DVIA-UB Series
Installation Report
XZZJS
ZEISS
SEM
DVIA-UB700
200828R3
Xuzhou

Prepared for

XZZJS

Prepared by

Engineer: Hosang YuDate of business trip : 17.12.27~17.12.29
Tuning date: 22.12.13
Report written date: 22.12.19

Overview

The DVIA-UB700 active vibration isolation platform is appropriately installed and functioning as intended.

System Information

Model: DVIA-UB700

Serial Number: 200828R3

Engineer

Hosang Yu, from DAEIL SYSTEMS

Tuning Date

December 13, 2022

Location

XUZHOU, China

Equipment

ZEISS SEM

Data and Image

Z-axis (Vertical) Transmissibility

X-axis (Left to Right) Transmissibility

Y-axis (Front to Back) Transmissibility

Equipment image

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-ULF Series
Date12-19-2022
Tags
DVIA-UB Series
Installation Report
XZZJS
ZEISS
SEM
DVIA-UB700
200828R3
Xuzhou