Installation Report
DVIA-ULF Series
05-26-2026
Shanghai Institute of Technical Physics DVIA-UB700 (180927R1) Installation Report
DVIA-ULF Series
Installation Report
Shanghai Institute of Technical Physics
SITP
DVIA-UB700
180927R1
Shanghai
China
Contents
Target equipment
-
Place of installation
1F, Shanghai Institute of Technical Physics(SITP)
Remark
Good performance
END USER
Shanghai Institute of Technical Physics(SITP)
Operator: Choi, Sung Won
Date of setup : 18.12.19
Date of reporting : 18.12.26
Date of business trip : 17.12.27~17.12.29
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 2018.12.19 (Wednesday)
Operator: Daeil System, Manager Sung Won Choi
Place of measurement : 1st Floor, SITP
Equipment Model: -
| Test Condition: VC-Class | Z | X | Y |
|---|---|---|---|
| Floor | D | E | E |
| Above Active | G | G | G |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Octave Band Result (BASE: Floor, TOP: Above Active)
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-ULF Series
Date05-26-2026
Tags
DVIA-ULF Series
Installation Report
Shanghai Institute of Technical Physics
SITP
DVIA-UB700
180927R1
Shanghai
China
Related Case Studies

DVIA-ULF Series
Shanghai Institute of Technical Physics DVIA-UB700 (180927R1) Installation Report
12-26-2018Read more

DVIA-ULF Series
Shanghai Institute of Technical Physics UB700 P8 Installation Report
05-26-2026Read more

DVIA-ULF Series
ZF(China) Investment Prisma E DVIA-UB700 (220718R8) Installation Report
10-21-2022Read more