Skip to main content

Vibration Isolation Case Studies

DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.

Series

Equipment Type

Manufacturer

All Case Studies

1264 case studies
Tier-1 Semiconductor STM (Omicron) MC3000_P7 vibration worksheet — 2018.12.03

WORKSITE worksheet for MAIN YANG MC3000_P7 (measurement 2018.11.30, report dated 2018.12.03): STM (Omicron) at Tier-1 Semiconductor–class fab redacted site, engineer Choi HyoungMun (DAEIL SYSTEMS). Publishes the MC3000 internal program VC-class graphs, octave-band curves (Floor vs Above Active), and acceleration spectra by axis.

Zhejiang University HITACHI H-7650 TEM DVIA-MB1000 (MB1000 P70) Installation Report — 2018-09-17

Hangzhou campus MB1000_P70 worksheet for a HITACHI H-7650 TEM site at Zhejiang University (1th FLOOR). End user line reads Zhejiang University of Traditional Chinese Medicine; overview, dates, operator lines, VC-Class summary, and MB1000 internal-program plus octave-band plots follow the 2018-09-17 Word form. §2a embed mapping: image2–4 internal program Z/X/Y, image5–7 octave-band Z/X/Y; centred Set up title graphic (image1) is not republished. No Vibration specification or Reference headings in the source — none added.

Zhejiang University Hitachi SU8010 DVIA-MB1000 (P68) MB1000 program worksheet — 2018.09.17

DVIA-MB1000 MB1000 program handout (project P68) for a Hitachi SU8010-class SEM at Zhejiang University (1th FLOOR) with end user Zhejiang University of Traditional Chinese Medicine. The Word form’s overview, VC-Class summary table, MB1000 internal-program Z/X/Y plots, and octave-band (Floor vs Above Active) Z/X/Y screenshots follow §2a embed order; the narrow masthead raster on the centred “MB1000_P68 Set up” title line is not republished. Field engineer Choi, HyoungMun (DAEIL SYSTEMS); measurement 2018.09.12; Date Created 2018.09.17.

Xiamen University FEI QUANTA FEG 650 DVIA-MB1000 (MB1000 P62) Internal program worksheet — 2018-09-17

DVIA-MB1000 worksheet (MB1000 P62) for FEI QUANTA FEG 650 at Xiamen University (1th FLOOR). Business trip 2018-09-13; workbook Date Created 2018-09-17; measurement 2018-09-13 with Rater Daeil System, Manager Choi, Hyoung Moon. The VC-Class summary grid and narrative lines follow the DOCX verbatim. Decorative title-line raster (image1 under the centred “Xiamen University MB1000_P62 Set up” head) is not republished; MB1000 internal-program and Octave Band Result screenshots use §2a embed mapping (image2–7). No Vibration specification or Reference headings appear in the source; none were added.

MC1000 (P58) vibration setup report — in-house TEM at KBSI (2018-07-30)

MC1000 (P58) active isolation setup follow-up at Korea Basic Science Institute: VC-Class summary, MB1000 internal-program Z/X/Y captures, and octave-band floor vs isolator-top plots from the 2018-07-27 site measurement (seven figures; pre-title decorative raster omitted).

Shanghai Institute of Material Research ZEISS Gemini 500 DVIA-MB1000 (171201R1) Installation Report — 2018.07.02

DVIA-MB1000 serial 171201R1 MB1000 worksheet for ZEISS-Gemini500 at Shanghai Institute of Material Research (Room 111). Operator Sung Won Choi (DAEIL SYSTEMS); setup 2018-06-29; report 2018-07-02. Publishes VC-Class summary, MB1000 internal-program Z/X/Y screenshots, and octave-band (BASE: Floor, TOP: Above Active) Z/X/Y plots; the decorative title-block graphic under the setup heading is not republished. The issued form has no Reference or Vibration specification section.