Skip to main content

Vibration Isolation Case Studies

DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.

Series

Equipment Type

Manufacturer

All Case Studies

1264 case studies
Shanghai Veterinary Research Institute DVIA-M1000 Installation Report (220714R2)

CAAS Shanghai Veterinary Research Institute — DVIA-M1000 (SN 220714R2), measurement 2022-08-09, report 2022-08-11.

CRRC Qishuyan Locomotive & Rolling Stock Technology Research Institute ZEISS SIGMA 300 DVIA-UB700 (220302R3) Installation Report

DVIA-UB700 (S/N 220302R3) active vibration isolation platform installation report prepared for CRRC Qishuyan Locomotive & Rolling Stock Technology Research Institute Co., Ltd.; ZEISS SIGMA 300 located in CHANGZHOU, China; tuning date August 6, 2022; engineer Youngha Lee. Published figures from Data and Image: Z/X/Y-axis transmissibility and one equipment site photo.

Ningbo Institute of materials ZEISS GEMINI300 DVIA-M1000 (210714R2-2) Installation Report — 2022.08.05

DVIA-M1000 serial 210714R2-2 worksheet for ZEISS GEMINI300 at Ningbo Institute of materials (宁波材料所), BINZHOU site line. The form lists setup and reporting dates, Overview with on-site measurement metadata (2022.08.04), VC-Class summary (Floor vs Above Active), MB1000 internal-program Z/X/Y plots, and Octave Band Z/X/Y results. A masthead-only graphic embedded beside the institute title line is omitted from the public page.

ZEISS SIGMA500 (Qingdao) DVIA-ML1000 Installation Report (SN 220308R4, Aug 2022)

Confidential mainland customer — ZEISS SIGMA500 reference line, Qingdao installation. SN 220308R4, setup 2022-08-01. MB1000 internal program plots (Z/X/Y), octave-band summaries, and instrumentation setup imagery.

Shanghai University ZEISS GEMINI300 DVIA-M1000 (220411R2) Installation Report

DVIA-M1000 abbreviated worksheet for serial 220411R2 (source M1000_220411R2_22.07.28.docx). Target equipment ZEISS GEMINI300 with END USER Shanghai University(上海大学); installation place SHANGHAI; report dates 22.07.28 / 22.08.01 per the form; operator Lee, Young ha; measurement dated 2022.07.28 (Thursday). Overview sentence as printed. MB1000 internal program plots under Z axis, X axis, and Y axis. Decorative bitmap on the university header line was omitted from the public page.

Ningbo Institute of materials ZEISS Gemini 300 DVIA-M1000 (210714R2-2) Internal Program Performance — Binzhou — 2022.07.27

DVIA-M1000 serial 210714R2-2 — Ningbo Institute of materials, target equipment ZEISS GEMINI300, measurement in BINZHOU on 2022-07-27. Worksheet publishes the on-site equipment view under the setup title and MB1000 internal-program plots for Z, X, and Y as in the source. Decorative header raster behind the institute line is not republished.