Vibration Isolation Case Studies
DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.
Series
Equipment Type
Manufacturer
All Case Studies

CSOT Wuhan HELIOS 5 UC DVIA-ML1000 Installation Report (220401R2, 2022-09-28)
CSOT Wuhan — HELIOS 5 UC on DVIA-M1000 (SN 220401R2). MB1000 internal program plots and octave-band results.

SNU Precision DVIA-UB350 (220727R3) Installation Report — Asan
DVIA-UB350 (S/N 220727R3) installation report for SNU Precision headquarters (Asan): first setup noise from stage motion resolved by replacing 70 kg springs with 180 kg springs, followed by second setup and vibration measurement 2022-09-21. Published VC-curve and transmissibility plots (before/after adjustment) for Z/X/Y axes, spring-replacement summary tables, and PULSE 22 measurement setup notes; decorative title-block bitmap (image1) and Generic Vibration Criteria figure (image17) omitted — Reference uses the site VC criterion markdown table.

Jiangsu Modern Road & Bridge Axia ChemiSEM HiVac DVIA-M1000 (220718R3) Installation Report — Nanjing
DVIA-M1000 worksheet for serial 220718R3 (source M1000_220718R3_22.09.19.docx). END USER Jiangsu Modern Road & Bridge · Axia ChemiSEM HiVac in Nanjing. Setup/reporting dated 22.09.19 per the form with operator Yu, Ho Sang; measurement session 2022.09.19 (Monday) recorded as printed. Publication includes installation photograph under the setup title row, VC-Class Floor vs Above Active summary, MB1000 internal-program transmissibility/coherence screenshots, and octave-band spectra. Decorative signature-block raster on the company-header line was omitted.
Tier-1 Semiconductor Hitachi FE SEM DVIA-UB1000 (180305R3) Installation Report — Icheon
DVIA-UB1000 (serial 180305R3, 1140×910×224H mm) installation report at Tier-1 Semiconductor, icheon-si for Hitachi FE SEM equipment — tuned 2022-09-07 by Seounghoon Cheon (DAEIL SYSTEMS), reported 2022-09-14. Measurement with Data Physics Quattro / SignalCalc ACE; FFT 0–80 Hz, Hanning / 800 lines. VC summary (equipment off): Floor vs Active across Z/X/Y bands as in the Measurement Summary table. Publishes equipment-off Floor / Top VC and Transmissibility plots (nine figures). Decorative cover header bitmap omitted; ISO/VC reference chart replaced with markdown table.

New National Metrology Centre GBI DVIA-UB700 (220209R02) Installation Report
DVIA-UB700 (S/N 220209R02) installation report prepared for New National Metrology Centre; GBI system/600 kg at 2 Fusionopolis Way, Singapore; engineer Seounghoon Cheon. Tuning date 22.09.06 and report written date 22.09.14 per worksheet. Publication includes Data and Image: Z/X/Y-axis transmissibility plots; decorative header bitmap (image1) and Reference VC-criteria raster (image5) omitted.

Tier-1 Display Manufacturer Paju M2 SNU CTQ Equipment DVIA-UB350 (220211R02) Retuning Report — 2022-09-08
DVIA-UB350 (1260×800, serial 220211R02) horizontal-isolation performance check and retuning at Tier-1 Display Manufacturer (Paju) M2 for SNU CTQ equipment (2022-09-08 tuning, report 2022-09-14; engineers Cheon Seunghoon and Youngha Lee). Passive level adjusted for stage position and gain increased; six VC curves and transmissibility plots with 5 Hz / 10 Hz attenuation notes. Summary VC-class table; Reference as markdown criteria only.