Vibration Isolation Case Studies
DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.
Series
Equipment Type
Manufacturer
All Case Studies

Thermo Fisher Scientific Spectra 300 TEM DVIA-MB3000 Installation Report
Thermo Fisher Spectra 300 DVIA-MB3000 Installation

Korea Nanotechnology Institute JEOL JBX-8100FS DVIA-P2200 Installation Report
DVIA-P2200 (serial 240304R5) installation report for JEOL JBX-8100FS electron beam lithography at Korea Nanotechnology Institute 2F Nano Resource/Pattern Support Line, Gwanggyo. Measurement July 1, 2024; installation July 2, 2024. Published figures: equipment vibration specification diagram and per-axis VC, narrowband, and transmissibility plots. Reference uses the Generic Vibration Criteria markdown table only.

Fuzhou University Thermo Fisher Scientific Talos TEM DVIA-M-THT3 Installation Report
Internal program performance measurement for a Thermo Fisher Scientific Talos TEM on DVIA-M-THT3 (serial 240201R4) for Fuzhou University.

Hitachi Regulus 8230 DVIA-U350 Installation Report
Hitachi Regulus 8230 DVIA-U350 Installation

Gotion High-tech Hefei ThermoFisher Apreo 2S Hivac FIB-SEM DVIA-M1000 (240315R4) Installation Report
DVIA-M1000 installation report (serial 240315R4) for Gotion High-tech in Hefei, China. Overview states the platform is appropriately installed and functioning as intended. ThermoFisher FIB-SEM Apreo 2S Hivac; equipment condition The equipment is installed/Turned off. The published form has no separate vibration specification section or measurement summary table. Tuning Request UI capture and vertical / left-to-right / front-to-back transmissibility plots; no on-site equipment photo in the source report. Reference uses the standard VC criterion markdown table.

West Lake University Thermo Fisher Helios 5 Hydra DVIA-M1000 (230908R3-2) Installation Report — 2024.06.20
DVIA-M1000 serial 230908R3-2 — West Lake University (Hangzhou), Thermo Fisher Helios 5 Hydra. Handout covers set-up and reporting on 24.06.20 with internal-program performance plots for Vertical, Left to Right, and Front to Back; equipment/site photo after the title block.