Skip to main content
Installation Report
DVIA-ULF Series
07-14-2023

Xi'an Polytechnic University Sigma300 DVIA-U1000 (220531R1) Installation Report

DVIA-U Series
Installation Report
Xi'an Polytechnic University
Sigma300
DVIA-U1000
220531R1
Xi'an
China

Xi'an Polytechnic University

Xi'an Polytechnic University

(U1000_ 220531R1 Set up)

Site checklist

Target equipmentSigma300
Place of installationXi'an
RemarkGood Performance
END USERXi'an Polytechnic University

Operator and dates

Operator: Lee, Youngha Date of setup: 23.07.14 Date of reporting: 23.07.14Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-U1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2023.07.14 (Friday),

Operator: DAEIL SYSTEMS, Youngha Lee

Place of measurement: Xi'an, China

Equipment Model: Sigma300

U1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-ULF Series
Date07-14-2023
Tags
DVIA-U Series
Installation Report
Xi'an Polytechnic University
Sigma300
DVIA-U1000
220531R1
Xi'an
China