Skip to main content
Installation Report
DVIA-ULF Series
06-08-2023

BGRIMM Technology Group TESCAN VEGA GMS DVIA-U1000 (230202R1) Installation Report — Xiamen

DVIA-U Series
Installation Report
BGRIMM Technology Group
TESCAN VEGA GMS
Xiamen
DVIA-U1000
230202R1

BGRIMM TECHNOLOGY GROUP

BGRIMM TECHNOLOGY GROUP

(U1000_ 230202R1 Set up)

Site checklist

Target equipmentTESCAN VEGA GMS
Place of installationXIAMEN
RemarkGood Performance
END USERBGRIMM TECHNOLOGY GROUP

Operator and dates

Operator: Yu, Hosang Date of setup: 23.06.07 Date of reporting: 22.06.12Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-UB1000 active vibration isolation platform is appropriately installed and functioning as intended. Measurement date: 2023.06.08 (Thursday), Operator: DAEIL SYSTEMS, Hosang Yu Place of measurement: XIAMEN, China Equipment Model: TESCAN VEGA GMS

UB1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-ULF Series
Date06-08-2023
Tags
DVIA-U Series
Installation Report
BGRIMM Technology Group
TESCAN VEGA GMS
Xiamen
DVIA-U1000
230202R1