Installation Report
DVIA-ULF Series
06-08-2023
BGRIMM Technology Group TESCAN VEGA GMS DVIA-U1000 (230202R1) Installation Report — Xiamen
DVIA-U Series
Installation Report
BGRIMM Technology Group
TESCAN VEGA GMS
Xiamen
DVIA-U1000
230202R1
Contents
BGRIMM TECHNOLOGY GROUP
BGRIMM TECHNOLOGY GROUP
(U1000_ 230202R1 Set up)
Site checklist
| Target equipment | TESCAN VEGA GMS |
|---|---|
| Place of installation | XIAMEN |
| Remark | Good Performance |
| END USER | BGRIMM TECHNOLOGY GROUP |
Operator and dates
| Operator: Yu, Hosang Date of setup: 23.06.07 Date of reporting: 22.06.12 | Date of business trip : 17.12.27~17.12.29 |
|---|
Overview
The DVIA-UB1000 active vibration isolation platform is appropriately installed and functioning as intended. Measurement date: 2023.06.08 (Thursday), Operator: DAEIL SYSTEMS, Hosang Yu Place of measurement: XIAMEN, China Equipment Model: TESCAN VEGA GMS
UB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-ULF Series
Date06-08-2023
Tags
DVIA-U Series
Installation Report
BGRIMM Technology Group
TESCAN VEGA GMS
Xiamen
DVIA-U1000
230202R1
Related Case Studies

DVIA-ULF Series
Fujian Zijin Liyuan Material Technology Sigma300 DVIA-U1000 (230620R3) Installation Report — Xiamen
07-27-2023Read more

DVIA-ULF Series
BGRIMM TECHNOLOGY GROUP TESCAN VEGA GMS DVIA-UB700 (230202R1) Installation Report
06-12-2023Read more

DVIA-ULF Series
Shenzhen BYD Lithium Battery ZEISS Sigma 360 DVIA-U1000 (250107R2) Installation Report
05-18-2026Read more