Installation Report
DVIA-ULF Series
06-06-2023

Foshan Lehua Hengye Kitchen & Bath Co., LTD Sigma 300 DVIA-U1000 (230116R4) Installation Report — Changzhou

DVIA-U Series
Installation Report
Foshan Lehua Hengye Kitchen & Bath Co.
Sigma 300
Changzhou
DVIA-U1000
230116R4

Foshan Lehua Hengye Kitchen & Bath Co., LTD

Foshan Lehua Hengye Kitchen & Bath Co., LTD

(U1000_ 230116R4 Set up)

Site checklist

Target equipmentSigma 300
Place of installationCHANGZHOU
RemarkGood Performance
END USERFoshan Lehua Hengye Kitchen & Bath Co., LTD

Operator and dates

Operator: Lee, Youngha Date of setup: 23.06.06 Date of reporting: 22.06.12Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-UB1000 active vibration isolation platform is appropriately installed and functioning as intended. Measurement date: 2023.06.06 (Tuesday), Operator: DAEIL SYSTEMS, Youngha Lee Place of measurement: CHANGZHOU, China Equipment Model: Sigma 300

UB1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-ULF Series
Date06-06-2023
Tags
DVIA-U Series
Installation Report
Foshan Lehua Hengye Kitchen & Bath Co.
Sigma 300
Changzhou
DVIA-U1000
230116R4