Installation Report
DVIA-ULF Series
09-11-2023
HFIPS Sigma300 DVIA-UB700 Installation Report
DVIA-ULF Series
Installation Report
HFIPS
CAS
Sigma300
DVIA-UB700
230515R1
Contents
Prepared for
Hefei Institutes of Physical Science,Chinese Academy of Sciences
Prepared by
Engineer: Youngha Lee
Tuning date: 23.09.11
Report written date: 23.09.15
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-U1000 active vibration isolation platform is appropriately installed and functioning as intended.
System Information
Model: DVIA-UB700 910 x 1140 mm
Serial Number: 230515R1
Engineer
Youngha Lee, from DAEIL SYSTEMS
Tuning Date
September 11, 2023
Location
Hefei, China
Equipment
Sigma300
Data and Image
Z-axis (Vertical) Transmissibility
X-axis (Left to Right) Transmissibility
Y-axis (Front to Back) Transmissibility
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-ULF Series
Date09-11-2023
Tags
DVIA-ULF Series
Installation Report
HFIPS
CAS
Sigma300
DVIA-UB700
230515R1
Related Case Studies

DVIA-ULF Series
Fujian Zijin Liyuan Material Technology Sigma300 DVIA-UB700 (230620R3) Installation Report
07-27-2023Read more

DVIA-ULF Series
Xi'an Polytechnic University Sigma300 DVIA-UB700 (220531R1) Installation Report
07-14-2023Read more

DVIA-ULF Series
Goertek Inc. Shanghai Sigma300 DVIA-UB700 Installation Report
06-13-2023Read more