Zeiss EVO10 DVIA-MB1000 (210903R3) Internal Program Performance — 2021.11.11
DVIA-M Series
Installation Report
Zeiss
EVO10
DVIA-MB1000
210903R3
Contents
MB1000 P252 210903R3
| Target equipment | Zeiss-EVO10 |
|---|---|
| Place of installation | N/A |
| Remark | Good Performance |
| END USER | N/A |
| Operator: Choi, HyoungMun | Date of business trip : 17.12.27~17.12.29 |
| Date of setup : 21.11.10 | |
| Date of reporting : 21.11.11 |
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 21.11.10 (WED)
Operator: Daeil System, Research engineer Choi, HyoungMun
Place of measurement : N/A
Equipment Model: Zeiss-EVO10
Measurement conditions and results
Summary of measurement results
| Test Condition | Transmissibility | 2 Hz | 5 Hz | 10 Hz |
|---|---|---|---|---|
| Z | -35 dB | -25 dB | -30 dB | |
| X | -35 dB | -30 dB | -30 dB | |
| Y | -35 dB | -28 dB | -25 dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date11-11-2021
Tags
DVIA-M Series
Installation Report
Zeiss
EVO10
DVIA-MB1000
210903R3
Related Case Studies

DVIA-M Series
Baosteel R&D ZEISS EVO10 DVIA-MB1000 (200522R2-1 · P166) Internal program worksheet — 2020.12.15
12-15-2020Read more

DVIA-M Series
Jinhae Armed Forces Financial Management Command ZEISS FE-SEM EVO10 DVIA-MB1000 (230704R4) Installation Report
05-15-2026Read more

DVIA-M Series
Tier-1 Semiconductor Zeiss Gemini 2 FE-SEM DVIA-MB1000 (231128R4) Installation Report
05-29-2025Read more