BOE ZEISS Crossbeam 550 DVIA-MB1000 (MB1000 P181, 200720R5-1) Internal Program — 2021.01.22
DVIA-M Series
Installation Report
BOE
ZEISS
Crossbeam 550
DVIA-MB1000
MB1000 P181
200720R5-1
Contents
(MB1000 P181 200720R5-1)
| Target equipment | ZEISS-Crossbeam550 |
|---|---|
| Place of installation | N/A |
| Remark | Good Performance |
| END USER | BOE |
| Operator: Choi, HyoungMun | Date of business trip : 17.12.27~17.12.29 |
| Date of setup : 21.01.22 | Date of reporting : 21.01.22 |
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 21.01.22 (FRI)
Operator: Daeil System, Research engineer Choi, HyoungMun
Place of measurement : N/A
Equipment Model: ZEISS-Crossbeam550
Measurement conditions and results
Summary of measurement results
| Test Condition | Transmissibility | ||
|---|---|---|---|
| 2 Hz | 5 Hz | 10 Hz | |
| Z | -23 dB | -28 dB | -33 dB |
| X | -23 dB | -32 dB | -34 dB |
| Y | -25 dB | -32 dB | -40 dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date01-22-2021
Tags
DVIA-M Series
Installation Report
BOE
ZEISS
Crossbeam 550
DVIA-MB1000
MB1000 P181
200720R5-1
Related Case Studies

DVIA-M Series
BOE ZEISS Gemini 2 Crossbeam 550 DVIA-MB1000 (MB1000 P112) Internal program worksheet — 2019.05.24
05-24-2019Read more

DVIA-M Series
ZEISS Crossbeam 550 DVIA-MB1000 (221012R4) Installation Report
05-16-2026Read more

DVIA-M Series
ZEISS Korea Innovation Center DVIA-MB1000 (231128R4), ZEISS FIB-SEM Crossbeam 550 Installation Report
02-01-2024Read more