Shagang Group ZEISS Crossbeam 550 DVIA-MB1000 (201028R1 · P202, remote tuning) — 2021.04.12
DVIA-M Series
Installation Report
DVIA-MB1000
201028R1
ZEISS
Crossbeam 550
Shagang Group
Zhangjiagang
Remote tuning
Contents
(MB1000_201028R1 (P202) Set up)
| Target equipment | ZEISS Crossbeam550 |
|---|---|
| Place of installation | suzhou,Zhangjiagang, 沙钢集团 1F |
| Remark | Good Performance |
| END USER | :沙钢集团 |
| Operator: Doohyun Kim | Date of business trip : 17.12.27~17.12.29 |
| Date of setup : 21.04.12 | Date of reporting : 21.04.13 |
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 21.04.12 (Mon)
Operator: Daeil System, Research engineer Doohyun Kim
Place of measurement : 沙钢集团 1F
Equipment Model: ZEISS Crossbeam550
Measurement conditions and results
Summary of measurement results
| 2 Hz | 5 Hz | 10 Hz | |
|---|---|---|---|
| Z | -20 dB | -29 dB | -30 dB |
| X | -24 dB | -26 dB | -35 dB |
| Y | -24 dB | -26 dB | -32 dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date04-12-2021
Tags
DVIA-M Series
Installation Report
DVIA-MB1000
201028R1
ZEISS
Crossbeam 550
Shagang Group
Zhangjiagang
Remote tuning
Related Case Studies

DVIA-M Series
ZEISS Crossbeam 550 DVIA-MB1000 (221012R4) Installation Report
05-16-2026Read more

DVIA-M Series
ZEISS Korea Innovation Center DVIA-MB1000 (231128R4), ZEISS FIB-SEM Crossbeam 550 Installation Report
02-01-2024Read more

DVIA-M Series
Tier-1 Semiconductor Pyeongtaek P2 ZEISS Crossbeam 550 DVIA-MB1000 Installation Report (220902R5)
02-01-2023Read more